Chandrayaan-4 (ⓘ; from Sanskrit: Chandra, "Moon" and yāna, "craft, vehicle") is a planned lunar sample return mission of the Indian Space Research Organisation (ISRO) and the fourth iteration in its Chandrayaan lunar exploration programme.[2][3] As of January 2025 the conceptualisation phase has been completed, and the design phase is nearing completion.[4] The mission is expected to launch around 2027.[5] It is planned to return up to 3 kg (6.6 lb) of lunar regolith from near Shiv Shakti point, the landing site of Chandrayaan-3.[6]
Remove ads
History
Summarize
Perspective
Conceptual Phase
The plan for a lunar sample return mission was revealed by the director of the Space Application Centre (SAC), Nilesh M Desai on 17 November, 2023 during the 62nd foundation ceremony of the Indian Institute of Tropical Meteorology (IITM) in Pune.[7] This was confirmed by S. Somanath, the then chairman of ISRO, during the National Space Science Symposium held in Goa on 26 February 2024.[8] He said that the mission is extremely challenging as it incorporates multiple launches, docking capability and robotic capability. He expressed the confidence buildup over the success of 'hop' operation of the lander and Earth return operation performed by the propulsion module of Chandrayaan-3.[8][9] After the launch of INSAT-3DS, the chairman stated the insufficiency of the rocket capability leading to a 'novel design' for this mission and the secretary of the Department of Space (DoS) said that the mission incorporates 'high-end technology' and it is pending government approval for him to have a final word.[2][10] Somanath stated that the mission demands docking capability both in Earth and lunar orbits and the agency is planning to demonstrate this capability through Space Docking Experiment (SPADEX) which is slated for launch by year end.[3][11]
On 20 August 2024, S. Somanath announced that the Indian Space Research Organisation (ISRO) had completed the design of both Chandrayaan-4 and LUPEX,[12][13] and is now requesting approval from the government.[14]
On 13 February 2025, the Minister of Science and Technology, Jitendra Singh Rana, stated in the Rajya Sabha that Chandrayaan-4 will be a foundational mission that will validate key technologies needed for a crewed lunar landing in 2040.[15][16] As of February 2025, ISRO is developing a number of subsystems, such as robotic arms for sample collection, specialized payloads, and a high-capacity propulsion system.[17] ISRO organised a research meet in April 2025 to deliberate on the scientific research that can be conducted with the lunar regolith within India.[4]
Cabinet approval
On 18 September 2024, Chandrayaan-4 received approval from the Union Cabinet, chaired by Prime Minister Narendra Modi for ₹2,104.06 crore (US$250 million) and is expected to be completed within 36 months.[18][19] The mission will have five modules that will be carried to space on two different launches. The mission is designed to land on the lunar surface, collect samples, store them in a vacuum-sealed container, and return them to Earth. The mission will also see docking and undocking — two spacecraft aligning and coming together in orbit.[20][21]
Remove ads
Objectives
The aim of the mission is to collect samples from the lunar surface and bring the samples safely to Earth for scientific studies. The objectives of this mission are:
- To perform a safe and soft landing on the lunar surface.
- To demonstrate lunar sample collection and containerization.
- To demonstrate ascent from the Moon's surface.
- To demonstrate docking and undocking in lunar orbit.
- To demonstrate the transfer of samples from one module to another.
- To demonstrate return and re-entry to Earth for sample delivery.[8]
Remove ads
Spacecraft
Summarize
Perspective
The mission will be launched in two phases onboard two LVM3 rockets developed by ISRO. The spacecraft will include five modules packed into two composites, which will be launched separately, using two separate LVM 3 launch vehicles.[22]
The first launch is planned to carry the ascender module and descender module. The second launch would carry the transfer module, re-entry module, and propulsion module.[22]
The final spacecraft will be assembled into an integrated module by docking in Earth orbit before proceeding to the Moon.[8][3][23] This will be done via Earth-orbit docking maneuvers.
- Propulsion Module is similar to the propulsion module on Chandrayaan-3. It will ferry the combined modular spacecraft to the moon.[24][25][5]
- Lander Module will land on the Moon with instrumentation. It supports the ascent stage along with the soil sampling instrumentation. It is designed to last 1 lunar day or 14 Earth days on the moon.[24][25][5]
- Ascender Module will eject from the lander and launch from the Moon using the lander as a launch pad after the samples from the Moon are collected and stored. It will then enter low-lunar orbit.[24][25][5]
- Transfer Module will collect the samples from the ascent stage, transfer them to the re-entry module, fire its engine to set both itself and the re-entry module towards Earth, release the payload and loop back around the Earth.[24][25][5]
- Re-entry Module will hold the sample from lunar orbit. It is designed to survive atmospheric re-entry and land with the lunar regoliths.[24][25][5]
It is planned that after touchdown, a robotic arm, mounted on the Lander Module, will scoop about 2-3 kg of samples from around the landing site and transfer them to a container on the Ascent Module. In addition, a drilling mechanism will collect sub-surface samples and transfer them to another container in the Ascent Module.[6]
Apart from the propulsion module, the transfer module is also equipped with an onboard Liquid Apogee Motor (LAM) for return operation manoeuvres, including the trans-Earth injection. As per earlier reports, the lander module will have six throttleable landing thrusters capable of producing 800 newtons of thrust each, while the ascender module will have two lift off thrusters capable of producing 800 newtons of fixed thrust each.[26] The integrated assembly of all modules after docking in Earth orbit is expected to weigh at least 9,200 kg (20,300 lb).[26][17]
Remove ads
Landing site
The landing site is planned near to Statio Shiv Shakti, the landing site of Chandrayaan-3 which is located between the Manzinus P and Boguslawsky M lunar craters near to the south pole region.[27][28] ISRO had conducted comprehensive study of this landing site region regarding morphology, hydration and gravity anomalies using data obtained from payloads of Chandrayaan-2 orbiter, Lunar Reconnaissance Orbiter (LRO), Lunar Prospector and GRAIL.[29][30]