Top Qs
Timeline
Chat
Perspective
Chester and Crewe Railway
United Kingdom legislation From Wikipedia, the free encyclopedia
Remove ads
The Chester and Crewe Railway was an early British railway company, authorised in 1837 by the Chester and Crewe Railway Act 1837 (7 Will. 4 & 1 Vict. c. lxiii).
It was absorbed by the Grand Junction Railway in 1840 via the Chester and Crewe Railway Act 1840 (3 & 4 Vict. c. xlix).[1][2] The company built the section Chester–Crewe of the North Wales Coast line, 21 miles (34 km) in length, the engineer was Robert Stephenson and the contractor for the work was Thomas Brassey.[3] It was the absorption of this company that led the Grand Junction Railway to building its locomotive works at Crewe, which led to Crewe becoming a major railway town.
Remove ads
References
Further reading
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads