The Circular or Yellow line (code Y) (Chinese: 環狀線) is a metro line in New Taipei City, operated by New Taipei Metro. Despite this, it is fully integrated with the Taipei Metro system. The line currently runs between Dapinglin and New Taipei Industrial Park, and is approximately 15.4 km (9.6 mi) long with 14 stations.[5] The initial western section was opened on 31 January 2020.[3] Hitachi Rail Italy supplied 17 sets of 4-car driverless medium-capacity trains for the line.[6][1] Extensions are currently underway to form a full loop.
Remove ads
Construction
Hitachi Rail STS supplied electromechanical equipment for the line, including driverless technology and CBTC signaling.[6][1] Dapinglin, currently the only underground station on the line, was constructed by RSEA Engineering Corporation and employed the cut-and-cover method.[7]
Construction for the first phase officially broke ground on 11 July 2011 on a 6.3 km (3.9 mi) elevated section between Zhonghe and Banqiao.[8] The section is estimated to cost NT$13.7 billion, with the entire first-stage 15.4 km (9.6 mi) route estimated to cost NT$54.7 billion to construct.
The line includes the first elevated split platforms in the system at Zhonghe, Qiaohe, and Zhongyuan due to the narrowness of the available station area.[9][10]
The initial section between Dapinglin and New Taipei Industrial Park opened on 31 January 2020.[3] On 5 May 2023, the Circular line was transferred from the Taipei Metro to the New Taipei Metro,[11] with the fare structure still integrated with the Taipei Metro system, unlike light rail lines of the New Taipei Metro.[12]
Remove ads
Public art
Unlike previous public art installations on the metro, it was decided that a smaller number of art pieces would be installed within the same budget, allowing for large-scale artwork.[13]
Across the above ground section of the line, Emmanuelle Moureaux (a Tokyo based French architect and designer) spread distinctive bold colours across infrastructure – including steel beams and pillars, noise barriers, 13 stations and platforms, a bridge over the Tamsui River, and the exterior and interior design of the train.[13][14]
The platforms, walls and ceilings of Banqiao station are decorated by French artist Daniel Buren, using regular, contrasting coloured stripes.[13][15]
Remove ads
Stations in operation
The western section of the line officially opened on 31 January 2020.[3][16]
Services between Zhonghe and Banqiao were temporarily suspended from 3 April 2024 onwards due to the 2024 Hualien earthquake,[18] with the repair work expected to take one year to complete.[19] The section reopened ahead of schedule on 12 December 2024 at 12:00 PM Taiwan Standard Time.[20][21]
Stations under construction
Summarize
Perspective
The northern and southern sections are currently under construction.[a] The estimated completion date for those sections is 2031.
South section
Stations Y01–06 are approved for construction. (Unopened stations' names are to be confirmed)
North section
Stations Y21–32 are approved for construction. (Unopened stations' names are to be confirmed)
East section
Stations Y33–42 are currently under construction, scheduled to be completed in 2032. After completion, the Circular line will form a full circle. (Unopened stations' names are to be confirmed)
Remove ads
See also
Notes
- The listed station codes are those used for the construction project and may differ from those used by the operator.
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads