The Cleeton gas field and hub is a natural gas production, gathering, compression, treatment and transportation facility in the southern North Sea, 54 km east of Flamborough Head, Yorkshire. It has been producing and transmitting gas since 1988.
Remove ads
The Cleeton gas field
Summarize
Perspective
The Cleeton gas field, in UK Block 42/29, was discovered in April 1983. Cleeton was one of the 'Villages' gas fields; named after villages lost to the sea along the Holderness coast. These villages include: Cleeton, Dimlington, Hoton, Hyde, Newsham and Ravenspurn.
The reservoir is a Permian Lower Leman Sandstone Formation, estimated to have gas reserves of 280 billion cubic feet.[1] The reservoir was produced from wells drilled from the Cleeton Wellhead tower, CW. From CW gas, and associated condensate, flowed to the bridge-linked main platform, CPQ. Here it was treated in 3-phase separators, gas dehydration, condensate coalescers and produced water treatment plant. As wellhead pressures declined so gas was compressed on the compression platform, CC, installed in 1995.[2][3][4] Treated gas and condensate was sent to Dimlington gas terminal via the 36-inch pipeline. The production profile, in million cubic metres per year (mcm/y), of the Cleeton field was as follows.[5]
![]() | This graph was using the legacy Graph extension, which is no longer supported. It needs to be converted to the new Chart extension. |
The Cleeton field was shut down as unproductive in 1999. The cumulative total of gas produced since 1988 was 10,268 mcm.[5]
Remove ads
Other developments
In addition to the Cleeton offshore facilities a new gas terminal was built at Dimlington to receive and treat the gas prior to shipment into the National Transmission System.
The Ravenspurn gas field was being developed and from 1989 gas was routed to Cleeton for treatment, if required, and to Dimlington via the 36-inch pipeline.[6]
The Easington Catchment Area project was instigated in the late 1990s. A bridge-linked ECA riser tower (CT) was installed at Cleeton to receive gas from the ECA development. Gas was processed on Cleeton CPQ as required and was transmitted to Dimlington.
The Cleeton field was originally owned and operated by Britoil/BP, Perenco assumed ownership in 2012.[7]
Remove ads
Cleeton platforms
The Cleeton hub comprised the following bridge-linked platforms:[2][3][4]
Platform name | Cleeton Wellhead CW | Cleeton CPQ | Cleeton Compression CC | Cleeton ECA Riser CT |
---|---|---|---|---|
Installation type | Fixed steel platform | Fixed steel platform | Fixed steel platform | Fixed steel platform |
Coordinates | 54.033373N 0.727814E | 54.033373N 0.727814E | 54.033373N 0.727814E | 54.033373N 0.727814E |
Function | Wellheads | Risers, processing and accommodation | Compression | Risers and processing |
Year commissioned | 1987 | 1988 | 1995 | 1999 |
Water depth, metres | 50 | 50 | 50 | 50 |
Substructure weight, tonnes | 1,020 | 3,100 | 1,140 | |
Topsides weight, tonnes | 1,090 | 6,600 | 640 | 714 |
No. of legs | 4 | 8 | 4 | |
No. of Wells | – | – | – |
Cleeton pipelines
The following pipelines were connected to the Cleeton hub.[3]