Top Qs
Timeline
Chat
Perspective
Dual overhead rate
From Wikipedia, the free encyclopedia
Remove ads
Dual Overhead Rate Recovery is used in construction contracting as a costing equation for bidding a project, costing an existing project or allocating corporate overhead to multiple divisions of construction work. It produces two rates, 1) Labor / Equipment Rate 2) Material / Subcontract Rate. This equation produces a percentage allocation of each class of cost.[1]
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads