Top Qs
Timeline
Chat
Perspective
East London Transit
Bus rapid transit scheme in London From Wikipedia, the free encyclopedia
Remove ads
East London Transit (ELT) is a part-segregated[1] Bus Rapid Transit in London, England, operated as part of the London Buses network. The East London Transit opened in phases between 2010 and 2013. The scheme for this system was developed by Transport for London to meet the existing and anticipated demand for public transport in east London caused by the Thames Gateway redevelopment, and has been planned to allow for a possible future upgrade to tram operation.[2]
![]() | This article needs to be updated. (April 2017) |
It connects National Rail, London Underground, Elizabeth line and London Overground stations in the London boroughs of the Redbridge, and Barking and Dagenham with other major population centers, such as Barking Riverside, that were currently only served by bus routes. The first stage of the scheme opened on 20 February 2010. There are proposals for a variety of extensions.
Remove ads
History
Summarize
Perspective
The East London Transit (ELT) was developed by Transport for London as an integrated public transport system in conjunction with the London Borough of Barking and Dagenham and the London Borough of Redbridge and other stakeholders.[3][4]
There are three routes in the East London Transit system. EL1 replaced the previous route 369 bus service and operated 24 hours a day, initially between Thames View Estate and Ilford, and has since been extended from Thames View Estate to Barking Riverside. EL2 operated over the whole length of the phase 1 route between Dagenham Dock and Ilford until March 2016, when it was amended to run to Becontree Heath after leaving Barking. EL3 replaced the previous route 387 operated between Little Heath and Barking Riverside, the route change through Barking Town Centre.[clarification needed] As a result of these changes, route 179 was withdrawn between Ilford and Barking and was diverted to terminate at Ilford (Hainault Street) bus terminus.[5][6]
Each route operates five buses an hour on Monday to Saturday daytimes and three buses an hour during the evenings and on Sunday; this gives a combined frequency of ten buses an hour over the core route from Barking to Thames View Estate during the day.[7][8]
Delivered phases
- Phase 1
Phase 1 commenced on 20 February 2010.[9]
- Phase 2
- Barking — Thames View Estate — Dagenham Dock
Construction of phase 2 began in 2011 and was completed in 2013. It received funding from the Homes and Communities Agency.[10]
Extension to Barking Reach
In 2013 it was proposed to extend route EL1 from Thames View Estate to Barking Reach and a consultation was held.[11] The extended service started on 7 September 2013.[12]
Extension to Barking Riverside, Northgate Road

In 2020, the route EL1 was extended from the Barking Reach terminus to further serve the new housing developments that had been built in the area. The route was extended to terminate at the newly built Northgate Road on the far east side of the development and was routed to pass the new Barking Riverside station and Barking Riverside pier that opened in 2022. Route EL3 also has two schoolday journeys that are extended beyond Mallards Road to Northgate Road, however the route still terminates at Mallards Road at all other times.
Remove ads
Network
Route EL1 operates via these primary locations:[13]
- Ilford Hill for Ilford station
- Ilford Ilford Lane
- Barking station
- Vicarage Field Shopping Centre
- Creekmouth Waverley Gardens
- Thames View Christ Church
- Barking Riverside Riverside Centre
- Barking Riverside station
- Barking Riverside Northgate Road
Route EL2 operates via these primary locations:[14]
- Becontree Heath Leisure Centre
- Becontree Martins Corner
- Barking Longbridge Road
- Barking Park Bus Garage / Faircross
- Barking station
- Vicarage Field Shopping Centre
- Creekmouth Waverley Gardens
- Thames View Christ Church
- Dagenham Choats Road
- Dagenham Dock Terminus for Dagenham Dock station
Route EL3 operates via these primary locations:[15]
- Little Heath Chadwell Heath Lane
- King George Hospital
- Goodmayes station
- Barking Park Bus Garage / Faircross
- Barking station
- Vicarage Field Shopping Centre
- Creekmouth Waverley Gardens
- Creekmouth Thames Road
- Barking Riverside Riverside Centre
- Barking Riverside station
(limited service)
- Barking Riverside Northgate Road (limited service)
Remove ads
Vehicles

All services are operated by Go-Ahead London using New Routemasters from River Road garage. In February 2017, Blue Triangle commenced a new contract on routes EL1 and EL2 along with new route EL3 (which replaced the similarly routed 387). These routes gradually introduced New Routemasters, with some of them painted in East London Transit livery, which is colored in different accents of red and mandarin orange.[16]
Future developments
Proposed destinations
Early proposals for extensions have included Gants Hill for the Central line, Rainham, Barkingside, Romford, Elm Park and Collier Row and Harold Wood.[2] Havering London Borough Council has voiced support for the extension to Rainham through London Riverside.
In a bus network development paper from 2016, a new route EL4 was proposed between Barking Riverside station and Becontree Heath Leisure Centre via Becontree Underground station. In a council meeting in July 2023, Barking & Dagenham council had talked with TfL about extending the proposed route to Romford.[17]
Additional proposals include services to Gallions Reach for the Docklands Light Railway, East Ham, Silvertown and Stratford.[18]
Thames Gateway Transit
The East London Transit formed part of a plan for a much larger Thames Gateway Transit service, which would use the Thames Gateway Bridge to connect to the Greenwich Waterfront Transit on the south side of the River Thames. However, construction of the bridge and the Greenwich busway was cancelled in 2008.
Remove ads
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads