Embankment Exchange is a residential development in the Greengate area of Salford, Greater Manchester, England. It comprises 300 apartments across two buildings connected by a central podium: the 107 m (349 ft) tall North Tower and 50 m (163 ft) tall South Tower.[2] The buildings were designed by Jeffrey Bell Architects.[3]
As of March 2025, the North Tower is the fifth-tallest building in Salford and the joint 22nd-tallest building in Greater Manchester with City Tower.
Remove ads
History
Planning
The planning application was submitted to Salford City Council in August 2015,[4] with planning approval obtained in March 2016.[5]
Construction
In 2017, Elliot Group commenced construction of the complex, then called 'The Residence',[2] but progress was delayed the following year when main contractor Forrest went into administration.[6] Work stalled again in 2020 pending the results of a wider fraud investigation,[6] before restarting in February 2022 following the acquisition of the site by Legacie Developments who renamed the development 'Embankment Exchange'.[7] Construction was expected to complete in 2023,[2] and in October 2024 it was announced that completion was due by the end of the year.[8]
Remove ads
Facilities
The development will include a spa, gym, residents lounge and bar, work-from-home booths and a 24-hour concierge.[9]
Gallery
- 'The Residence', under construction in October 2019
- Embankment Exchange nearing completion in January 2024
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads