Top Qs
Timeline
Chat
Perspective

Gebze Metro

Rapid transit system under-construction From Wikipedia, the free encyclopedia

Gebze Metro
Remove ads

The Gebze Metro (Turkish: Gebze Metrosu) is an under-construction rapid transit system in Gebze and Darıca, Turkey. The system consists of a single 15.4 km (9.6 mi) long line running north from Darıca to Gebze The metro system will be the first network to exist outside of a provincial capital in Turkey, as Gebze and Darıca are located within the Kocaeli Province.

Quick Facts Overview, Native name ...

Construction began in late 2018, but inauguration date has been delayed regularly.[3][4][5] As of February 2025, the line is expected to open in late 2026.[6]

Remove ads

Network

Most of the metro line will be underground, except for a 900 m (3,000 ft) section which will be at-grade. The line will interchange with TCDD Taşımacılık high-speed and intercity trains along with Marmaray commuter trains to Istanbul at Gebze railway station. A maintenance facility and a control center will be constructed at Pelitli, in north Gebze.[2]

The first of a total of 28 driverless trains was delivered late 2023.[7] Journey time is expected to be 19 minutes and the projected daily ridership is expected to 4,800.

Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads