Top Qs
Timeline
Chat
Perspective

Guantang LNG Terminal

Upcoming LNG terminal in Guanyin, Taoyuan City, Taiwan From Wikipedia, the free encyclopedia

Guantang LNG Terminalmap
Remove ads

The Guantang LNG Terminal (traditional Chinese: 觀塘液化天然氣接收站; simplified Chinese: 观塘液化天然气接收站; pinyin: Guāntáng Yèhuà Tiānránqì Jiēshōu Zhàn) is a liquefied natural gas (LNG) terminal under construction in Datan Borough, Guanyin District, Taoyuan City, Taiwan.

Quick Facts General information, Status ...
Remove ads

History

The terminal design was originally drafted in 2015. In 2018, the government considered relocating the terminal but rejected this idea because the new proposed site was reserved for a planned offshore wind farm.[1] On 8 October 2018, the terminal project passed its environmental impact assessment.[2] The construction of the terminal is expected to be completed by 2025.[3]

Architecture

The terminal will span an area of 9 km2.[4] The original location of the terminal was proposed to be 455 meters from the coastline. However, due to pressure from environmental activists over to the existence of a sensitive coral reef in the nearby area, the terminal was redesigned to be 750 meters further away, with a total distance of around 1.2 km out to the sea from the shoreline. The relocation design was expected to add NT$15 billion to the cost of the project, for an estimated total cost of NT$75 billion.[3]

Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads