Top Qs
Timeline
Chat
Perspective
HillTopper Wind Farm
From Wikipedia, the free encyclopedia
Remove ads
The HillTopper Wind Farm is a 74-turbine wind farm near Mount Pulaski in southeastern Logan County in the U.S. state of Illinois. The turbines were designed to generate a maximum of 185 megawatts of electricity.[1] The complex was completed by Enel Green Power at a cost of approximately $325 million, and entered operations in 2018.[2]
Remove ads
Detail
The HillTopper complex's 74 wind turbines are each rated at 2.5 mW.[3] The project's overall 185-mW capacity was pre-sold to Bloomberg LP, Danone North America, General Motors, and Starbucks.[1] The complex utilizes leasehold rights to 7,500 acres of land.[2]
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads