Top Qs
Timeline
Chat
Perspective

Imperial Valley Geothermal Project

Geothermal power project in California From Wikipedia, the free encyclopedia

Imperial Valley Geothermal Projectmap
Remove ads

Imperial Valley Geothermal Project is a complex of eleven geothermal power stations located in the Salton Sea Geothermal Field, along the southeastern shore of the Salton Sea in the Imperial Valley of California. It is the second largest geothermal field[clarification needed] in the United States after The Geysers in Northern California.[citation needed]

Quick Facts Official name, Country ...
Remove ads
Remove ads

Description

Summarize
Perspective
Salton Trough area. The red lines are simplified faults. Right-lateral direction of motion of the transform fault is shown (pink arrows). The red rhombs are pull-apart basins; the northern one is the site of the Niland (Salton Sea) geothermal field, the southern the Cerro Prieto geothermal field.

Parts of Imperial Valley lie atop the Salton Sea Geothermal Field, a region of high geothermal energy with an estimated 2,950 MW of geothermal potential. Of that total, 2250 MW are currently developable, while the remaining 700 MW would become available as the Salton Sea (a saline lake) dries up.[2] About 403 MW is generated by the existing power plants, ten of which are owned by CalEnergy and one by EnergySource.[3]

Geothermal power and lithium extraction

The geothermal activity below the Salton Sea loosens up lithium that can be mined.[4] The California Energy Commission estimates the Salton Sea might produce 600k metric tons of lithium carbonate (Li
2
CO
3
) per year,[5] of a reserve of 3.4 million tonnes.[6]

In 2016, the Australian firm Controlled Thermal Resources (CTR) announced plans to build a 140 MW geothermal power plant and a lithium extraction facility capable of producing 15,000 tons (13,600 tonnes) by 2023 and 75,000 tons (68,000 tonnes) by 2027. The company hopes to create a major new domestic source of the mineral, which is a key ingredient used in batteries for electric cars and energy storage. The project is expected to be operational by 2023.[7][8] General Motors announced a strategic partnership with CTR in 2021 to secure a local supply of lithium. The majority of the battery-grade lithium hydroxide and carbonate for the Ultium battery will come from this plant.[9]

Remove ads

Geothermal power stations

This is a table of all constituent geothermal power stations.[2][1]

More information Name, Units ...
Remove ads

See also

References

Loading content...
Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads