Top Qs
Timeline
Chat
Perspective
Kandivli West metro station
Mumbai Metro's Yellow Line 2A metro station From Wikipedia, the free encyclopedia
Remove ads
Kandivali (West) is an elevated metro station serving Siddhivinayak Nagar neighbourhood of Kandivli on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1][2][3]
Remove ads
History
J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[4] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[5] Kandivli West was opened to the public on 2 April 2022, along with the first phase of Line 2A.[6]
Station layout
2nd Floor | Side platform ![]() | |
Platform 2 Southbound |
2A toward Andheri (West) (Dahanukarwadi) → | |
Platform 1 Northbound |
← 2A toward Dahisar (East) (Shimpoli) | |
Side platform ![]() | ||
1st Floor | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
G | Street level | Exit/Entrance |
Power and signaling system
Like all other stations and railways of Mumbai metro, Valnai station also uses 25,000 volt AC power system by overhead catenary to operate the trains.
Remove ads
See also
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads