Top Qs
Timeline
Chat
Perspective

Kanpur Monorail

From Wikipedia, the free encyclopedia

Remove ads

The Kanpur Monorail was a proposed monorail system for the city of Kanpur.[1][2]

Quick facts Overview, Owner ...
Remove ads

Lines

There are three lines proposed in phase I are as follows:[3]

  • From Panki Sector 18 to Shuklaganj via Govind Puri – Jarib Chauki – Central – Ghantaghar 8 Point – Shuklaganj. Length of this line would be 24.5 km
  • From Chobepur to Maharajpur via IIT Kanpur – Kalyanpur – Rawatpur – Kanpur AnwarganjKanpur Central. Length of this line would be 28.5 km
  • From Kanpur Zoo to Kanpur Cantonment via Old Kanpur – Civil Lines – Wazid Pur. Length of this line would be 16.0 km

Total length of Phase I would be 63.0 km.

Other lines

Other lines which are being proposed in addition to Phase I are:[4]

Remove ads

Status

Feasibility study has been completed for Phase I corridors. Work was predicted to start after 2016.[3] As of 2021 no work has commenced.

In 2016 the State Government approved the rail based Kanpur Metro, which began construction in 2021. It is not clear if the metro corridors will replace the monorail plans.

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads