Kitchener is one of the seven passenger lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends westward from Union Station in Toronto to Kitchener, though most trains originate and terminate in Brampton in off-peak hours.
Remove ads
History
Summarize
Perspective
Services
The GO Transit Georgetown line opened on April 29, 1974, becoming the second line in the GO Transit rail network. Peak-direction train service operated between Georgetown and Union Station, replacing a commuter service previously operated by Canadian National Railway (CN).[2]
Service was extended beyond Georgetown to Guelph on October 29, 1990, but was again cut back to Georgetown on July 2, 1993.[2]
Limited weekday midday service was introduced in April 2002, with four trains in each direction between Union and Bramalea. These trains were discontinued in 2011 to facilitate construction of the Georgetown South Expansion project.
On December 19, 2011, the Georgetown Line was renamed the Kitchener Line as service was extended to Kitchener, making one intermediate stop at Guelph. Another intermediate stop, Acton, opened on January 7, 2013.[2]
Weekday midday service was re-introduced in September 2015, with hourly service between Mount Pleasant and Union.[3]
In September 2019, GO Transit introduced limited off-peak train service along the entire length of the line, with two new weekday round trips operating between Toronto and Kitchener outside of peak periods.[4][5][6]
On October 18, 2021, service to London, Ontario began as a pilot project; one train per weekday in each direction runs as an extension of Kitchener line service, with intermediate stops in Stratford and St. Marys. The existing Via Rail station in each community served as each stop.[7][8] Service beyond Kitchener was discontinued following the end of the project, on October 13, 2023.[9]
On April 8, 2023, hourly weekend service was introduced between Mount Pleasant and Union, with Kitchener express bus connections at Bramalea.[10] Since the weekend service was introduced, passengers have complained about overcrowding on the new express buses between Bramalea and Kitchener, which at certain times resulted in some passengers being unable to board the buses.[11]
On November 23, 2025, GO Transit will introduce weekend service to Acton, Guelph and Kitchener with four trains in the schedule.[12]
Infrastructure
As a part of the GO Transit Rail Improvement Program, the West Toronto Diamond was grade separated. The Metrolinx Weston Subdivision, which carries the Kitchener Line as well as Union Pearson Express and Via trains, was lowered into a trench to pass under CP's North Toronto Subdivision.[13] Trains began using the new grade separation in May 2014.[14]
The Georgetown South railway expansion project was initiated in 2009 with Metrolinx now as its proponent.[15] The project represented a significant increase in railway capacity, with the former one- to two-track[16] railway being widened to 4 tracks within Toronto, with a total of 8 tracks where the Milton line and Barrie line share the corridor. All level crossings along the corridor were eliminated using railway or roadway underpasses. The plan would allow for an increased frequency of trains on the route, increasing service from approximately 50 per day to about 300.[17] It drew criticism from Weston community groups, which opposed the increased use of diesel locomotives on the basis of air pollution. They preferred instead that the corridor be electrified.[17] The group has also requested more stations along the route.[17]
The Georgetown South project was later reduced in scope due to cost overruns: the corridor was expanded to three tracks, with the fourth track as well as the dedicated Barrie line tracks deferred to future projects. Construction on the Weston subdivision itself finished in 2015,[18] allowing Union Pearson Express to begin operating, while additional track work in the Union Station Rail Corridor continued into 2016.[19]
In 2009 Metrolinx purchased 26 kilometres (16 mi) of track along the corridor from Toronto to Bramalea for $160 million.[20]: 10 In September 2014, it purchased the 53 kilometres (33 mi) of track from Georgetown to Kitchener from CN for $76 million.[21]
In 2019, Metrolinx conducted a series of public forums on electrification of the Kitchener line from Georgetown to Kitchener, in a change from its earlier Regional Express Rail plan, which had called for continuation of diesel train service on the western portion of the line. Electrification plans reaffirmed overall Metrolinx goals of track bed and bridge improvements, quad-tracking sections of the line, and the addition of a station at Breslau.[22]
On November 16, 2025, Mount Dennis station will open in the Mount Dennis neighbourhood of Toronto. The station will provide a direct transfer to the Toronto subway's Line 5 Eglinton.[23]
Remove ads
Station list
Remove ads
Current service
GO Transit train service previously operated on weekdays only. Weekend bi-directional hourly service was introduced on April 8, 2023, with all trains terminating at Mount Pleasant GO.[25] During the times that trains do not operate, corresponding GO bus service is provided.
On weekdays during peak periods in the peak direction, approximately two trains per hour operate the full route between Toronto and Kitchener, while additional trips operate shorter segments to and from Toronto. Express trains typically serve all stations between Kitchener and Bramalea, and operate non-stop between Bramalea and Union.
Outside of peak periods, service operates hourly between Mount Pleasant and Union, of which two off-peak in each direction also cover the entire route from Kitchener to Toronto.[4][5][6]
Future expansion
Summarize
Perspective
Future stations
The Region of Waterloo is planning to build Kitchener Central Station, a transit hub, at the north-east corner of King and Victoria streets in Kitchener. The hub would serve GO Transit trains and buses as well as other local and intercity public transit services.[24]
A Breslau GO Station was proposed in 2008,[26] and was included in an official expansion plan in June 2016.[27] In 2024, the Region of Waterloo purchased land for the future station.[28]
In 2025, construction began on a station near Woodbine Racetrack in Toronto. Upon its opening, Woodbine GO Station will replace Etobicoke North GO Station, which is located about two kilometres to the east.[29]
As part of Toronto mayor John Tory's SmartTrack initiative, two new stations are planned along the Kitchener line within Toronto: St. Clair–Old Weston GO Station at St. Clair Avenue West and King–Liberty GO Station near Liberty Village.[30]
Future track improvements
The provincial initiative known as GO Expansion proposes upgrading the Kitchener line to increase service frequency, with the eventual goal of two-way, all-day hourly service to Kitchener, and two-way all-day 30-minute service to Mt. Pleasant, seven days a week.[31]
Achieving the desired frequencies would require separate tracks for freight and passenger trains. CN Rail owns a 19-kilometre (12 mi) segment of the line between Georgetown and Bramalea that would be bypassed by a proposed 30-kilometre (19 mi) track to which freight traffic would be shunted. Once completed, Metrolinx will acquire the track segment between Bramalea and Georgetown.[32] Between Georgetown and Kitchener, GO trains and CN freight trains share a single track line, which would need to be double-tracked.[12]
On April 30, 2021, the Ontario Ministry of Transportation and Metrolinx released a preliminary business case for mid-term infrastructure improvements which would permit more frequent Kitchener line service, as well as a Request for Qualifications for smaller, short-term infrastructure improvement projects on the line.[33] The business case, dated to March 2021, estimated a reduction of GO train travel times from Kitchener to Toronto's Union Station from 111 minutes to 98 minutes with infrastructure improvements which would lift existing slow orders on the line due to poor infrastructure repair.[34]: 1 With grade separation of Silver Junction near Georgetown, there would be a further reduction to 90 minutes, along with improved reliability due to the elimination of the need for a train meet at Georgetown,[34]: 19 as well as the mitigation of potential conflicts with freight operations.[34]: 2 Metrolinx estimated that ridership on the line with full improvements would be 11,008,500 per year, compared to 7,035,100 per year with no improvements ("business as usual"); the vast majority of the increased ridership would be attributable to the instituting of all-day, two-way service.[34]: 22
In May 2022, Metrolinx announced that the construction contract was awarded to Dagmar Construction Inc. The work would include:[35]
- a second platform at Guelph Central GO Station
- an extension of the north platform at Guelph Central GO Station
- a new storage track for maintenance vehicles west of Guelph
- a new passing track 2.6 kilometres (1.6 mi) long in Breslau (Woolwich Township)
- a new passing track at Acton GO Station
- a new storage track for maintenance vehicles near Rockwood
- track re-alignments between Kitchener and Georgetown
By October 2025, Metrolinx had reached an agreement with CN in order to upgrade the line west of Georgetown for all-day, two-way hourly service to Kitchener. The planned work includes adding 40 kilometres (25 mi) of new track, signal upgrades, bridge work, track re-alignments and platform expansions. There would be dedicated tracks for GO trains.[12]
Remove ads
See also
- Halton Subdivision – Canadian National rail line between Brampton and Georgetown partially used by Kitchener line trains
- Quebec City–Windsor Corridor (Via Rail) – larger trans-provincial rail corridor which includes the Kitchener line route
- Rail transport in Ontario
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads