Top Qs
Timeline
Chat
Perspective
LGV Interconnexion Est
French high-speed railway From Wikipedia, the free encyclopedia
Remove ads
The LGV Interconnexion Est is a French high-speed rail line that connects the LGV Nord, LGV Est, LGV Sud-Est and LGV Atlantique through the suburbs of Paris. Opened in 1994, it consists of three branches, which begin at Coubert:
- west branch: towards Paris and western France, terminating at Valenton at the Grande Ceinture line, which connects to the LGV Atlantique at Massy TGV
- north branch: towards northern France, London and Brussels, joining the LGV Nord at Vémars
- south branch: towards southeastern France, joining the LGV Sud-Est at Moisenay
LGV Interconnexion Est | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The south and west branches are now shared with the LGV Sud-Est line.
Maximum line-speed throughout is 300 km/h (186 mph).
Remove ads
Route
Starting from the south (LGV Sud-Est), the line begins at Coubert junction and heads northeast. Near Tournan, there is a link to the Paris-Coulommiers line. Further north, Marne-la-Vallée – Chessy TGV station (transfer to the RER A) serves the new town of Marne-la-Vallée and Disneyland Paris theme parks. Near Claye-Souilly, two links under construction will join the line to the LGV Est. The route next serves Aéroport Charles de Gaulle 2 TGV station (transfer to the RER B and air transport). Shortly thereafter, the line joins the LGV Nord at Vémars junction.
Remove ads
Journey times
- Lille–Roissy CDG 0:50
- London – Marne-la-Vallée–Chessy TGV (for Disneyland Paris) 2:43
- Lille–Lyon 2:50
- Lille–Nantes 3:50
- Lille–Grenoble 4:25
- Lille–Marseille 4:30
- Lille–Bordeaux 5:00
- Brussels–Lyon 3:40
- Brussels–Marseille 5:25
- Brussels–Valence 4:30
- Brussels–Rennes 4:50
- Brussels–Montpellier 5:40
Expansion
- The construction of a suburban line along the LGV between Villeparisis and Vémars is under consideration. This project could have two possible purposes: to serve Roissy airport from Paris (as an alternative to the CDG Express); or to be the beginning of a western line linking Creil to Meaux, Marne-la-Vallée and Melun.
- It has also been proposed to complement the Interconnexion Est with an LGV Interconnexion Sud or LGV Interconnexion Ouest.
- In November 2010, RFF began formal studies of a link from the Interconnexion Est to the Paris - Creil - Amiens line.[1]
External links
- High-speed rail lines site (in French)
See also
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads