Leman gas field
Natural gas field in the North Sea From Wikipedia, the free encyclopedia
Remove ads
The Leman gas field is a natural gas field located in the North Sea 30 miles (48 km) northeast of Great Yarmouth, United Kingdom. Named after the Leman Sandbank beneath which it is situated, the gas reservoir is a 18 miles (29 km) long, 5 miles (8.0 km) wide,[2] 800 ft (240 m) thick Rotliegendes sandstone reservoir at a depth of about 6,000 ft (1,800 m).
![]() | Parts of this article (those related to remaining reserves and ongoing production) need to be updated. (April 2024) |
Following its discovery in August 1966, the reservoir was divided into blocks 49/26 and 49/27 to facilitate the licensing of mineral rights. Block 49/26 has been licensed to Shell since the beginning, with Block 49/27 originally licensed to the Amoco-Gas Council joint venture before being transferred to Perenco UK Ltd. Production of natural gas and condensates began in 1968, with both products sent via pipeline systems to the Bacton Gas Terminal on the coast of Norfolk for international distribution.
The initial total proven reserves of the Leman gas field were around 11 trillion ft3 (316 km3), with a production rate of around 200 million ft3/day (5.7×105 m3).[3]
Remove ads
Development
Summarize
Perspective
The Shell Leman 49/26A (AD1, AD2, AP & AK) installation began production in August 1968. It had initial recoverable reserves of 292 billion m3.[4] It is connected to the Shell terminal at Bacton. Leman 49/26B (BT & BH) and 49/26B (BP & BD) began production in November 1970. Leman 49/26C (CD & CP) began in February 1972. Leman 49/26D began in August 1974. Leman 49/26E started in August 1983. Leman 49/26F and 49/26G began in September 1987. The Leman complex of platforms are connected to Bacton via Leman 49/26A, which is east of the Hewett complex. A decommissioned 36-inch pipeline formerly delivered gas from Leman 49/26BT to Bacton. Gas and condensate is piped to Bacton via Leman 49/26A Complex (AK, AP, AD1 and AD2).
The installations developed by Shell were:[5]

The Shell Leman 49/26A complex also receives gas from the Corvette CV installation (Block 49/24) via a 36.6 km, 20-inch pipeline.

Block 49/27 of the Leman field is licensed to, and operated by, Perenco UK Ltd, originally by the Gas Council-Amoco. BP took over the interests of Amoco in 1998 and operated as BP-Amoco, subsequently BP. Perenco UK Ltd took over the interests of BP in the Leman and Indefatigable fields and BP plant at Bacton in 2003. The field had initial recoverable reserves of 292 billion m3.[4] It comprises the following installations, platforms and complexes: Leman 49/27A (AD, AP, AC, AQ, AX); 49/27B (BD, BP, BT); 49/27C (CD, CP); 49/27D (DD, DP); 49/27E (ED, EP); 49/27F (FD, FP); 49/27G; 49/27H; and 49/27J. Gas is routed to Bacton via two 30-inch pipelines from Leman 49/27A and Leman 49/27B.
The Leman installations developed by Amoco, now owned by Perenco, were:
The Perenco Leman 49/27A complex also receives gas from the Camelot CA installation (Block 53/1a) via a 14.5 km, 12-inch pipeline.
In the mid-1990s the glycol dehydration facilities of several installations in the Inde and Leman fields was decommissioned. This enabled the installations to become normally unattended installations (NUIs) reducing manning costs and the risks to personnel.
Remove ads
Production
The Leman gas composition and properties are as follows.[5]
The annual gas production from the Shell Leman field (in million standard cubic feet) was:[5]
![]() | This graph was using the legacy Graph extension, which is no longer supported. It needs to be converted to the new Chart extension. |
The annual gas production from the Amoco Leman field (in million standard cubic feet) was:[5]
![]() | This graph was using the legacy Graph extension, which is no longer supported. It needs to be converted to the new Chart extension. |