Line 2 (Athens Metro)

Rapid transit line in Athens, Greece From Wikipedia, the free encyclopedia

Line 2 (Athens Metro)
Remove ads

Line 2 of the Athens Metro runs entirely underground from Anthoupoli in the northwest to Elliniko in the south, via Syntagma. It first opened, between Sepolia and Syntagma, on 28 January 2000, with Line 3.

Quick Facts Προς Ανθούπολη/ΕλληνικόTo Anthoupoli/Elliniko, Overview ...

On 6 April 2013, Line 2 was extended to Anthoupoli in the north west,[2] and on 26 July 2013 to Elliniko to the south.[3]

Remove ads

History

Line 2 is one of two modern metro lines, along with Line 3 that were built to reduce traffic congestion in the Athens urban area. Both lines were opened on 28 January 2000, with Line 2 initially running between Sepolia and Syntagma: the initial section of Line 2 included an interchange with Hellenic Train services (then operated directly by the Hellenic Railways Organisation) at Larissa Station, two interchanges with Line 1 at Attiki and Omonia, and one interchange with Line 3 at Syntagma.[4]

The first extension of Line 2, between Syntagma and Dafni, opened on 15 November 2000.[5]

Remove ads

Future extensions

Summarize
Perspective

According to the Athens Metro Development Plan of September 2022, Elliniko Metro (who develops and builds Metro extensions) is exploring extensions to both ends of Line 2.[6] Both extensions first appeared in the Souflias plan in April 2009, which envisaged the extension of Line 2 to Zefyri in the north, and Glyfada in the south.[7]

Extensions to Ilion and Acharnes

The first phase of the northern extension may consist of a 4.0 km (2.5 mi) line from Anthoupoli to Agios Nikolaos in 2031, with intermediate stations at Palatiani and Ilion (for Line 4): a second phase may consist of a line from Agios Nikolaos to Acharnes, with intermediate stations at Kamatero and Zefyri (for Athens Suburban Railway trains).[6][8]

More information Station, Municipality ...
More information Station, Municipality ...

Currently, Hellenic Metro is looking for companies to fund the initial extension to Ilion with major contenders being: TERNA, INTRAKAT, AVAX-GHELLA-ALSTOM, AKTOR-METKA, it is also possible that the EU helps fund this project. With the funding reaching an estimated 550 million euros needed.[9]

Extension to Glyfada

The southern extension may consist of a 4.4 km (2.7 mi) line from Elliniko to Glyfada, with intermediate stations at Ano Glyfada and Grigoriou Lampraki.[6][8]

More information Station, Municipality ...

Cancelled proposals

There was a plan for Line 2 to have a branch line from Panepistimio to Alsos Veikou: that proposal was absorbed by the U-shaped Line 4 on 1 December 2005, with Georgios Souflias (then Minister for the Environment, Physical Planning and Public Works) stating that the branch line proposal would have limited the frequency of trains on either branch.[10] The branch line was similar to a part of Line 4 now under construction, but it did not include Elikonos.[11]

Remove ads

Stations

Summarize
Perspective

The spelling of the station names on this table, in English and Greek, are according to the signage. All Line 2 stations, except for Agios Dimitrios, have two tracks and two side platforms: Agios Dimitrios has an island platform layout.[12]

Terminal station
# Interchange station
More information Station English, Station Greek ...
Remove ads

Notes

  1. The Line 1 station opened on 30 June 1949.[15]
  2. The opening date applies to the Line 2 station only.
  3. The Line 1 station opened on 17 May 1895, and was resited on 21 July 1930.[15]