Top Qs
Timeline
Chat
Perspective

Line 2 (Changchun Rail Transit)

Metro line in Changchun, China From Wikipedia, the free encyclopedia

Line 2 (Changchun Rail Transit)
Remove ads

Line 2 of the Changchun Rail Transit (Chinese: 长春轨道交通2号线; pinyin: Chángchūn Guǐdào Jiāotōng Èr Hào Xiàn) is a rapid transit line running from west to east Changchun.

Quick Facts Overview, Status ...
Remove ads

History

Phase 1

Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.[2]

Western extension

The western extension to Auto Park opened on 8 October 2021.[1] The extension is 4.36 km in length.[3]

Opening timeline

More information Segment, Commencement ...

Service routes

  • Qiche GongyuanDongfang Square

Stations

More information Station name, Connections ...
    Remove ads

    Future Development

    Eastern extension

    An eastern extension to Zhaojiagang East is under construction. The extension is 10.607 km in length.[4] It's scheduled to open in 2025.

    References

    Loading related searches...

    Wikiwand - on

    Seamless Wikipedia browsing. On steroids.

    Remove ads