Top Qs
Timeline
Chat
Perspective

Line 2 (Naples)

Commuter urban railway in Naples, Italy From Wikipedia, the free encyclopedia

Line 2 (Naples)
Remove ads

Line 2 (Italian: Linea 2) is an 18.9-kilometre (11.7 mi)[1][2] commuter rail line, part of the Naples metropolitan railway service (suburban railway service) in Naples, Italy. As of January 2024, Line 2 connects 12 stations. It is operated by Trenitalia.

Quick Facts Overview, Status ...
Line 2
Napoli San Giovanni–Barra
Napoli Galileo Ferraris
(
under
construction
)
Napoli Gianturco
Napoli Piazza Garibaldi
Napoli Piazza Cavour
Napoli Montesanto
Napoli Piazza Amedeo
Napoli Mergellina
Napoli Piazza Leopardi
Napoli Campi Flegrei
Cavalleggeri Aosta
Bagnoli-Agnano Terme
Pozzuoli Solfatara

Line 2 operates on the Naples Passante railway, which crosses the city of Naples from west to east. All regional trains, differently from metropolitan trains, are received by Campi Flegrei station in different platforms.

Line 2 also has some minor regional extensions. These are the Naples-Caserta and Naples-Salerno (all these services use the Passante rapid transit railway, of which the latter two start from Campi Flegrei station).

Remove ads

History

The construction of the line, part of the ″direttissima″ Rome–Naples, was begun in 1911 and after a suspension during World War I, it was completed in 1925 between Pozzuoli and Piazza Garibaldi, electrified with third rail. Two years later the ″direttissima″ was completed, and the electrical rail service was extended towards Villa Literno and San Giovanni-Barra.[3]

In November 1935 the line was also electrified with overhead line; the third rail was discontinued in 1938.[4]

In 1997, the line was numbered as Line 2, while the other Naples Metro line became Line 1. The two lines were connected with a pedestrian tunnel between Museo and Cavour in 2002 and in Garibaldi station in 2012

In 2001, operation of the line was taken over by Metronapoli SpA, a newly established joint stock company in which Trenitalia held a 38% stake. However, in November 2005, operation of line 2 was transferred back to Trenitalia, and that company sold its Metronapoli shares to the municipal government.[5]

Since 2009, the line is crossed only by metropolitan trains.[6]

Remove ads

Rolling stock

The metropolitan service started in 1925 with third rail cars of type E.20 transferred from the Ferrovie Varesine.[3]

In 1938 the third rail system was discontinued,[3] and the E.20 substituted by the newer E.624 equipped with overhead line.[7]

From 1962–63 the E.624 were moved and substituted by the new EMUs of type ALe 803,[8] and from 1983 the ALe 724.[9]

Line 2 also uses ALe 582 (currently no longer in service) and the newest double-decker Treno ad alta frequentazione and Jazz trains.

In 2016, the replacement of ALe 724 began through the supply of 24 ETR 425 "Jazz" trains, these new electric trains, are also used on the Salerno-Naples Campi Flegrei line. The replacement was completed in 2023 through the supply of 12 ETR 104 "Pop" trains, which have a special "metro" configuration, sacrificing seats in favor of the convoy's standing capacity.

Remove ads

Route

Thumb
Montesanto station.
More information Station, Interchanges ...

Map

Thumb
Line 2 (Naples)

See also

References

Bibliography

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads