Top Qs
Timeline
Chat
Perspective

Line 3 (Chongqing Rail Transit)

Monorail line of Chongqing Rail Transit From Wikipedia, the free encyclopedia

Line 3 (Chongqing Rail Transit)
Remove ads

CRT Line 3 (and the branch line branded as Konggang line) runs from north to south, linking the districts separated by Chongqing's two main rivers, the Yangtze (Chang Jiang) and Jialing rivers. Built by Japan's ODA project, it uses Hitachi, Ltd. monorail vehicles and technology. The first phase of the line began construction on 5 April 2007. The initial segment from Lianglukou to Yuanyang (18 stations, 17.5 km (10.9 mi)) opened on September 29, 2011, with a northern extension from Yuanyang to Jiangbei Airport opening on December 30, 2011[3] and a southern extension from Ertang (Currently Chongqing Jiaotong University) to terminus Yudong on December 28, 2012.[4] At 55.5 km (34.5 mi), plus 9.97 km (6.20 mi) for Konggang branch line opened on December 28, 2016, Line 3 is the longest single monorail in the world by track length.[5][6] Line 3 is also the world's busiest monorail line with a daily ridership of over 675,000 passengers per day.[1]

Quick Facts Overview, Other name(s) ...
Thumb
Interior of a Line 3 train showing an open gangway design
Thumb
Okinawa Urban Monorail. Like the CRT Line 3, it is made by Hitachi.

There are interchange stations in central Yuzhong district for transfer to Jiefangbei CBD with Line 1 at Lianglukou and with Line 2 at Niujiaotuo.

Remove ads

Opening timeline

More information Segment, Commencement ...
Remove ads

Service routes

Current stations

More information Service routes, Station No. ...
  1. Out of system transfers
  2. The former English translation is South Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station
Remove ads

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads