Line 3 (Ningbo Rail Transit)

Metro line in Ningbo, China From Wikipedia, the free encyclopedia

Line 3 (Ningbo Rail Transit)

Line 3 of Ningbo Rail Transit (Chinese: 宁波轨道交通3号线) is a rapid transit line in Ningbo. It starts from south Fenghua District and ends in Datong Bridge Station in Jiangbei District. In the future extension plan, the line will further extend into Luotuo Area in Zhenhai District.[2] The construction of the first section, from south Yinzhou to Datong Bridge, started on 23 December 2014.[3]

Quick Facts Overview, Status ...
Line 3
Line 3 train at Jinhai Road station
Overview
StatusOperational
OwnerNingbo
LocaleNingbo, Zhejiang, China
Termini
Stations24
Service
TypeRapid transit
SystemNingbo Rail Transit
Operator(s)Ningbo Rail Transit Co., Ltd.
History
Opened30 June 2019; 5 years ago (2019-06-30)[1]
Technical
Line length37.45 km (23.27 mi)
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+12 in)
ElectrificationOverhead catenary with 1,500 V DC
Route map
Close

Route

Line 3 starts from Jinhai Road station as a elevated line. It goes north behind the Airport Road until Chaoyang station and turns into east direction on Yanhu Road to Shishan station. Then it turns north again and underground into Gaotang Bridge Station. Then it turns into east-west direction on Yinzhou Avenue and makes a further turn into Ningnan South Road and goes in north-south direction again until it reaches Songjiang Middle Road. Then it runs to northeast to Qiubi and then crosses the Ningbo–Taizhou–Wenzhou railway from which it goes in north-south direction and extends along Zhongxing Road until it crosses Yongjiang River and reaches its destination, Datong Bridge Station.[4]

Phase 2 of line 3 will have 5 more stations north of Datong Bridge, but due to restrictions of an old airport, part of the phase 2 between Datong Bridge and Yongmao Road is stalled for construction.[5] The rest 3 stations of phase 2 has started construction since 2 December 2019,[6] and will temporary run trains of line 5 until phase 2 of line 5 completed. Test run of phase 2 of line 3 started in 1 February 2024.[7]

Opening timeline

More information Segment, Commencement ...
SegmentCommencementLengthStation(s)Name
Datong Bridge — Gaotang Bridge 30 June 2019[1] 16.73 km (10.40 mi)[1] 15 Line 3 (Phase 1)
Gaotang Bridge — Minghui Road 28 September 2019 5.61 km (3.49 mi)[citation needed] 3 Yinfeng line
Minghui Road — Jinhai Road 27 September 2020[8] 15.92 km (9.89 mi) 6
Luotuo Bridge — Yongmao Road 28 June 2024[9] 3 Phase 2
Close

Stations

Phase 1

More information Service routes, Station name ...
Service routes Station name Connections Distance
km
Location
Local Rapid English Chinese
Datong Bridge 大通桥  2  0.00 0.00 Jiangbei
Zhongxing Bridge South 中兴大桥南 1.72 1.72 Yinzhou
Minglou 明楼  6  1.26 2.98
Sports Center 体育馆  7  0.98 3.96
Sakura Park 樱花公园  1  0.96 4.92
Children's Park 儿童公园  4  1.19 6.11
Qiubi 仇毕 0.98 7.09
Qianhu North Road 钱湖北路 1.43 8.52
Jinyu Road 锦寓路 0.97 9.49
Siming Middle Road 四明中路 1.17 10.66
Yinzhou Government 鄞州区政府  5  0.74 11.40
Southern Business District 南部商务区  8  1.33 12.73
Yinzhou Coach Terminal 鄞州客运总站 1.25 13.98
| Gouzhang Road 句章路 1.34 15.32
| Gaotang Bridge 高塘桥 0.82 16.14
Jiangshan 姜山 1.73 17.87
| Shishan 狮山 1.35 19.22
| Minghui Road 明辉路 1.31 20.53
| Chaoyang 朝阳 1.88 22.41
Fangqiao 方桥 4.46 26.87 Fenghua
| Jinlin 琎琳 2.58 29.45
| Nandu 南渡 1.61 31.06
Dacheng East Road 大成东路 4.04 35.10
Jinhai Road 金海路 2.35 37.45
Close

Phase 2

More information Station name, Connections ...
Station name Connections Location
English Chinese
Luotuo Bridge 骆驼桥 Zhenhai
Zhenhai Avenue (Cihai) 镇海大道(慈海)  7 
Yongmao Road 永茂路
Through train to  5  Buzheng.
Close

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.