Name of system |
Location |
Traction type |
Date (from) |
Date (to) |
Notes |
Trams in Arad (CTP Arad) |
Arad |
Horse |
24 Oct 1869 |
1916 |
|
Steam |
? |
? |
|
Diesel |
? |
? |
|
Electric |
29 Nov 1946 |
|
Gauge: 1,000 mm (3 ft 3+3⁄8 in) |
Trams in Botoșani (Eltrans) |
Botoșani |
Electric |
16 Sep 1991 |
31 Jul 2020 |
Plans were to repair the network and acquire new trams but in 2022 decision was to abandon the plan and dismantle network. |
Trams in Brăila (Braicar, S.A.) |
Brăila |
Horse |
1886 |
? |
|
Electric |
25 Jun 1900 |
|
In reconstruction, some new trams to come. |
BHHÉV/CFPBT/CFLB/CFR |
Brașov |
Steam/Diesel/Petrol |
7 Mar 1892 |
1 Apr 1960 |
|
IJTL/RAT Brașov |
Electric |
23 Aug 1987 |
17 Nov 2006 |
Replaced partially by trolleybus route 8. |
Trams in Bucharest (STB) |
Bucharest |
Horse |
28 Dec 1872 |
1929 |
|
Electric |
19 Dec 1894 |
|
See also: Bucharest Light rail. New trams since December 2022. Also older trams are being modernized (partially low floor, A/C, etc). Tenders for repairing the older network sections. |
Trams in Cluj-Napoca (CTP) |
Cluj-Napoca |
Steam |
28 Aug 1893 |
15 May 1902 |
|
Electric |
1 Oct 1987 |
|
Only new rolling stock. |
RATC Constanța |
Constanța |
Steam |
1905 |
? |
|
Electric |
18 Jul 1944 |
Aug 1944 |
Rolling stock requisitioned from Odesa. |
Electric |
23 Aug 1984 |
22 Nov 2008[1] |
|
Trams in Craiova (RAT Craiova) |
Craiova |
Electric |
- |
- |
Construction started 1942 (to be operated by rolling stock requisitioned from Odessa), never completed. |
Electric |
26 Sep 1984 |
Present |
Under repair. New trams operate on reconstructed sections in city. |
Trams in Galați (Transurb, S.A.) |
Galați |
Electric |
26 Jun 1900 |
|
Until 1978 gauge 1000 mm. Since 1978 1435 mm. Reconstructed and 8 new trams since 2021. Tender for 10 more trams. |
Trams in Iași (CTP Iași) |
Iași |
Electric |
1 Mar 1900 |
Present |
Gauge: 1,000 mm (3 ft 3+3⁄8 in). 32 new trams. Tender for another new 18-20 trams. |
Trams in Oradea (OTL R.A.) |
Oradea |
Electric |
25 Apr 1906 |
|
|
Trams in Ploiești (TCE Ploiești) |
Ploiești |
Electric |
1 Dec 1987 |
|
Fully repaired between 2014 and 2016. There are attempts to renew the fleet by buying new trams, searching financing. |
Trams in Reșita (T.U.R. S.A.) |
Reșița |
Electric |
20 Aug 1988 |
|
Reintroduction of trams was announced in 2016 and the modernization and expansion of the tram line began in 2019. Reopening planned for December 2022 [2] In 2023, the system was under testing and construction. In december 2024, the tram system was opened |
|
Satu Mare |
Steam |
14 Jun 1900 |
1900 |
|
Electric |
8 Aug 1900 |
31 Dec 1906 |
|
Tursib (after 1998) |
Sibiu |
Electric |
8 Sep 1905 |
1970 |
Gauge: 1,000 mm (3 ft 3+3⁄8 in) |
♦ Sibiu–Rășinari |
Electric |
1917 |
28 Feb 2011 |
Gauge: 1,000 mm (3 ft 3+3⁄8 in) Part of Sibiu tramway system. Regular service ceased on 28 February 2011.[3] Very limited operation that took place later – mainly only for visiting tourist groups – ended in 2012,[4] followed in 2013 by the start of work to dismantle the line. It is hoped to reopen a portion as a heritage tramway.[4] |
Trams in Timișoara (RATT) |
Timișoara |
Horse |
1869 |
? |
|
Electric |
27 Jul 1899 |
|
New trams since 2021. |