Top Qs
Timeline
Chat
Perspective
MRT Line 5
Mass rapid transit line of Dhaka Metro From Wikipedia, the free encyclopedia
Remove ads
The MRT Line 5 (Bengali: এমআরটি লাইন ৫, romanised: Em-Ar-Ti Lain Pachh) is an approved mass rapid transit line of Dhaka Metro Rail, in Bangladesh. It will be the third line of the Dhaka Metro Rail system and comprise the Northern Route and Southern Route. The construction of the MRT Line 5's Northern Route began on 5 November 2023 and is scheduled to commence operation by 2028.[1]
Remove ads
Background
In 2005, the World Bank published a study report, recommending that the government of Bangladesh build a mass transit system in Dhaka. In the same year, American consultancy firm Louis Berger Group prepared a strategic transport plan for Dhaka.[2] The World Bank helped to develop this plan, which proposed the construction of five MRT lines in Dhaka.[3] The five metro lines were MRT Line 1, MRT Line 2, MRT Line 4, MRT Line 5 and MRT Line 6.[4]
Remove ads
Stations
Summarize
Perspective
Northern Route
The construction of the Northern Route of the MRT Line 5 will start in July 2023 and will end by 2028.[5]
Southern Route
The Southern Route of MRT Line 5 is still in the planning stages. There may be changes to the list of stations, including adding new stations, assigning different names to the stations or some stations getting eliminated from the line. Hence, the list of stations is not final and may be updated in the future.
Remove ads
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads