Top Qs
Timeline
Chat
Perspective
Mitsubishi Heavy Industries Crystal Mover C810D
Class of electric multiple units in Singapore From Wikipedia, the free encyclopedia
Remove ads
The Mitsubishi Heavy Industries Crystal Mover C810D is an automated people mover vehicle which serves the Sengkang LRT line and Punggol LRT line as the third generation train after their previous counterparts Mitsubishi Heavy Industries Crystal Mover C810 and Mitsubishi Heavy Industries Crystal Mover C810A.
Remove ads
Overview
Summarize
Perspective
On 5 February 2021, the Land Transport Authority announced that it has purchased 17 two-car trains for the Sengkang and Punggol LRT systems. The new trains will be delivered progressively from 2024 to 2027 to replace the 25 existing one-car C810 trainsets. In addition to new trains, the Sengkang Depot will also be expanded to 11.1 ha (27.4 acres) from the existing 3.5 ha (8.6 acres) to ensure that it has capacity and maintenance space for the new trains. The expansion of the depot will also see two new reception tracks being built to shorten the train launching time. To ensure there is enough electricity to support the larger fleet of trains, 3 new power stations will be built, increasing the total number of power stations supporting the system to 8 once completed.[3] In May 2023, the LTA ordered an additional 8 C810D trains, bringing the total number of C810D trains ordered to 25. These 8 two-car trains will replace all 8 C810 two-car trainsets, while 8 C810A trainsets will remain in service, bringing the total fleet to 33 two-car trains.[4]
On 23 November 2024, the first batch of 25 new C810D trains has arrived in Singapore and will undergo testing and commissioning works at the Sengkang LRT Depot before entering passenger service by Q3 2025.[1] The first two-car configuration of the 25 C810D trains entered passenger service on 15 July 2025 with the deployment of trainset 59 on the Punggol LRT East Loop, with the remaining 23 trainsets to arrive progressively and enter passenger service from Q3 2025 until end-2028.[5]
Remove ads
Train formation
The configuration of a C810D in revenue service is M1–M2 with both the motors and the third rail current collectors.
The car numbers of the trains range from 58 to 82. Individual cars are assigned a two-digit serial number by the rail operator SBS Transit. A complete two-car trainset consists of two motor cars (M1–M2).
- Mitsubishi Heavy Industries built sets 58 – 82.
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads