Top Qs
Timeline
Chat
Perspective

Monte Pascoal (ship)

South Korean container ship From Wikipedia, the free encyclopedia

Monte Pascoal (ship)
Remove ads

Monte Pascoal is a container ship owned by A.P. Moller Singapore Pte. Ltd.[2] and operated by Maersk Line AS.[3] The 272-metre (892 ft) long ship was built at Daewoo Shipbuilding & Marine Engineering[1] in Okpo, South Korea in 2004. Originally owned by Monte Pascoal GmbH, a subsidiary of Hamburg Süd,[3] she has had two owners and been registered under two flags.

Quick facts History, Singapore ...

The vessel is one of ten ships of the Monte class built for Hamburg Süd by Daewoo Shipbuilding & Marine Engineering and Daewoo Mangalia Heavy Industries between 2004 and 2009.[8]

Remove ads

Construction

Summarize
Perspective

Monte Pascoal had its keel laid down on 9 August 2004[1] at Daewoo Shipbuilding & Marine Engineering[1] in Okpo, South Korea. Its hull has an overall length of 272 metres (892 ft).[1] In terms of width, the ship has a beam of 40 metres (130 ft).[1] The height from the top of the keel to the main deck, called the moulded depth, is 24.2 metres (79 ft).[1]

The ship's container-carrying capacity of 5,552 twenty-foot equivalent units (TEU) (5,552 20-foot shipping containers)[7] places it in the range of a Post-Panamax container ship.[9] The ship's gross tonnage, a measure of the volume of all its enclosed spaces, is 69,132.[1] Its net tonnage, which measures the volume of the cargo spaces, is 34,823.[1] Its total carrying capacity in terms of weight, is 71,475.9 long tons deadweight (DWT).[1]

The vessel was built with a HSD Engine Co. Ltd. 8RTA96C-B[6] main engine, which drives a controllable-pitch propeller. The 8-cylinder engine has a Maximum Continuous Rating of 45,760 kW with 102 revolutions per minute at MCR. The cylinder bore is 960mm. The ship also features 4 main power distribution system auxiliary generators, 3 at 4,100-kilowatt (5,500 hp), and 1 at 2,700-kilowatt (3,600 hp).[6] The vessel's steam piping system features an Aalborg CH 8-500 auxiliary boiler.[6]

Construction of the ship was completed on 5 January 2005.[1]

Remove ads

Notes

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads