Top Qs
Timeline
Chat
Perspective

NEL pipeline

From Wikipedia, the free encyclopedia

NEL pipelinemap
Remove ads

The NEL (Nordeuropäische Erdgasleitung (English: Northern European natural gas pipeline), formerly known as Norddeutsche Erdgasleitung, is a 440 kilometres (270 mi) long natural gas pipeline in Germany.

Quick Facts Location, Country ...
Remove ads

Route

The pipeline runs from Lubmin near Greifswald through Sülstorf and Achim to Rehden. It connects the Nord Stream 1 pipeline with the Rehden-Hamburg and MIDAL pipelines. The pipeline started operations on 5 November 2012.[1] Between Sülstorf and Achim, it uses a pre-existing installation.[2]

Technical features

The diameter of the pipeline is 56 inches (1,400 mm) and it uses 100 bars (10,000 kPa) operating pressure.[3] Its capacity is 20 billion cubic metres (710 billion cubic feet) of natural gas per year.[3][4] The pipeline is expected to cost around €1 billion.[5]

The developer of the pipeline asked exemption from the network access and transit fees regulation; however, this request was denied.[6]

Remove ads

Project company

The pipeline was built by OPAL NEL TRANSPORT GmbH.[7] It is operated by NEL Gastransport GmbH,[3] owned by WIGA Transport Beteiligungs-GmbH & Co. KG, a joint venture of Wintershall Dea and Gazprom.

See also

References

Loading content...
Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads