Top Qs
Timeline
Chat
Perspective

New Alamein

City in northwest Egypt From Wikipedia, the free encyclopedia

New Alameinmap
Remove ads

New Alamein (Arabic: العلمين الجديدة) is a new fourth generation[1] city in northwestern Egypt inaugurated by Egyptian President Abdel Fattah el-Sisi on 1 March 2018.[2][3] New Alamein lies on the Mediterranean Sea, approximately 48 km west-northwest of El Alamein International Airport. Still under construction, New Alamein was conceived by the Egyptian government as a center for tourism,[4] education,[5] and government. The city has its own presidential palace and ministry building.[6] Construction is ongoing at New Alamein for three universities, fifteen skyscrapers and high rise towers, and 10,000 hotel rooms.[7][8][9] Work has begun on Phase II of the New Alamein megaproject, which includes ten additional coastal towers.[10] New Alamein is now approaching its final stages of necessary developing in order for it to become a operational and habitable megaproject for tourism and residential needs.[11]

Quick facts العلمين الجديدة, Country ...
Remove ads

History

Egyptian President Abdel-Fattah al-Sisi inaugurated New Alamein on March 1, 2018.[2][3] Together with the as-yet-unnamed New Administrative Capital, which is set to replace Cairo as Egypt's capital,[12] New Alamein is one of the mega-projects of the al-Sisi government.[13] Abu Dhabi Crown Prince Sheikh Mohammed bin Zayed Al Nahyan toured the construction sites in New Alamein in March 2019.[14] Completed projects include a mega-mall, restaurants, three cinemas, and the Al Masa mosque.[15]

Remove ads

Economy

The Egyptian government intends for New Alamein to bring large numbers of tourists to the Mediterranean beaches of the northwest coast. The government asserts that approximately 30 developers have been granted permits to move forward with the construction of hotels for 30,000 rooms.[16] Many of these units are in high-rise buildings along the beach, with towers already under construction including The North Edge Towers and The Gate projects.[17] Other centers of activity in New Alamein will include three universities and a "city of culture and arts" to encompass a Roman Theater, studio complexes, an opera hall, and a cinema complex.[18]

Unlike the resorts on the northwest coast, which have private beaches sealed from public access,[19] New Alamein is conceived as being an open city permitting entry to the general public.[20][21]

Remove ads

Skyscrapers and towers

Summarize
Perspective
Tower name
Usage
Height
Floors
Year started
Construction status
Year completed
Total area
Developer
Notes
Render
Alamein Iconic Tower[22][23][24]Hotel, Office and Residential250 m (820 ft)682021Under construction2026NUCAAlamein's tallest Tower
D05[24] 210

(690 ft)

2025 Under construction
D06[24] 210

(690 ft)

2025 Under construction
D01M[24] 210

(690 ft)

2025 Under construction
D02M[24] 210

(690 ft)

2025 Under construction
Al Masa Towers 1 [25]Leisure & Hospitality~100m (~328 ft)212019Completed202128,000 sqmNUCA
Al Masa Towers 2 [25]Leisure & Hospitality~100m (~328 ft)212019Completed202128,000 sqmNUCA
Al Masa Towers 3[25]Hotel-serviced apartments~100m (~328 ft)212019Completed202131,500 sqmNUCA
Al Masa Towers 4 [25]Hotel-serviced apartments~100m (~328 ft)212019Completed202131,500 sqmNUCA
Al Masa Towers 5 [25]Hotel-serviced apartments~100m (~328 ft)212019Completed202131,500 sqmNUCA
Al Masa Towers 6 [25]Hotel-serviced apartments~100m (~328 ft)212019Completed202131,500 sqmNUCA
Downtown Tower A[22][23]Residential Tower200 m (656 ft)562021Under construction2025NUCA
Downtown Tower B[22][23]Residential Tower200 m (656 ft)562021Under construction2025NUCA
Downtown Tower C[22][23]Residential Tower200 m (656 ft)562021Under construction2025NUCA
Downtown Tower D[22][23]Residential Tower200 m (656 ft)562021Under construction2025NUCA
LD00 Tower A1 [26][27]Mixed Use392019Topped out202585,000 sqmNUCA
LD00 Tower B1 [26][27]Mixed Use352019Topped out202577,000 sqmNUCA
LD00 Tower C1 [26][27]Mixed Use382019Topped out202585,000 sqmNUCA
LD00 Tower D1 [26][27]Mixed Use342019Topped out202570,000 sqmNUCA
LD01 Tower A2 [26][27]Mixed Use382019Topped out202575,000 sqmNUCA
LD01 Tower B2 [26][27]Mixed Use342019Topped out202570,000 sqmNUCA
LD01 Tower C2 [26][27]Mixed Use312019Topped out202565,000 sqmNUCA
LD01 Tower D2 [26][27]Mixed Use272019Topped out202550,000 sqmNUCA
LD02 Tower A3 [26][27]Commercial, Hotel/ResortUnder construction202550,000 sqmNUCA
LD02 Tower B3 [26][27]Commercial, Hotel/ResortUnder construction202550,000 sqmNUCA
LD02 Tower C3 [26][27]Commercial, Hotel/ResortUnder construction202550,000 sqmNUCA
LD02 Tower D3 [26][27]Commercial, Hotel/ResortUnder construction202550,000 sqmNUCA
LD02 Tower E3 [26][27]Commercial, Hotel/ResortUnder construction202550,000 sqmNUCA
LD03 Tower A4 [26][27]Mixed UseUnder construction202550,000 sqmNUCA
LD03 Tower B4 [26][27]Mixed UseUnder construction202550,000 sqmNUCA
LD03 Tower C4 [26][27]Mixed UseUnder construction202550,000 sqmNUCA
LD03 Tower D4 [26][27]Mixed UseUnder construction202550,000 sqmNUCA
LD04 Tower A5Residential Tower160 m (525 ft)422021Under construction202581,000 sqmCity Edge Developments
LD04 Tower B5Residential Tower160 m (525 ft)422021Under construction202581,000 sqmCity Edge Developments
LD04 Tower C5Residential Tower160 m (525 ft)422021Under construction202581,000 sqmCity Edge Developments
Marina Tower A[28]Mixed Use150 m (492 ft)402021Under construction202685,000 sqmNUCA
Marina Tower B[28]Mixed Use150 m (492 ft)402021Under construction202685,000 sqmNUCA
Marina Tower C[28]Mixed Use150 m (492 ft)402021Under construction202685,000 sqmNUCA
North Edge Tower A[29][27]Residential Tower160 m (525 ft)422019Topped out202581,600 sqmCity Edge Developments
North Edge Tower B[29][27]Residential Tower160 m (525 ft)422019Topped out202581,600 sqmCity Edge Developments
North Edge Tower C[29][27]Residential Tower160 m (525 ft)422019Topped out202580,500 sqmCity Edge Developments
North Edge Tower D[29][27]Residential Tower160 m (525 ft)422019Topped out202580,500 sqmCity Edge Developments
North Edge Tower E[29][27]Residential Tower160 m (525 ft)422019Topped out202580,500 sqmCity Edge Developments
Orascom Tower A[30]Mixed Use200 m (656 ft)452021Under construction202790,000 sqmNUCA
Orascom Tower B[30]Mixed Use200 m (656 ft)452021Under construction202790,000 sqmNUCA
The Gate A[31][27]Mixed Use170 m (558 ft)442019Under construction2025318,000 sqmCity Edge Developments
The Gate B[31][27]Mixed Use170 m (558 ft)442019Under construction2025258,000 sqmCity Edge Developments
Remove ads

Future proposed towers

NameUsageMax heightRoof heightFloorsStartedConstruction statusTotal areaDeveloperNotesRenders
Fourland Seaspark Twin Towers[32]Hotel, Office and residential2x 200 m (656 ft)2x 200 m (656 ft)2x 45N/AProposed concept?CUBE Designs

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads