Top Qs
Timeline
Chat
Perspective
Oil megaprojects (2011)
From Wikipedia, the free encyclopedia
Remove ads
Following is a list of Oil megaprojects in the year 2011, projects that propose to bring more than 20,000 barrels per day (3,200 m3/d) of new liquid fuel capacity to market with the first production of fuel. This is part of the Wikipedia summary of Oil Megaprojects.
![]() | This article may be confusing or unclear to readers. (December 2007) |
Quick links to other years
Overview | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 | 2019 | 2020 |
Detailed list of projects for 2011
Summarize
Perspective

Terminology
- Year Startup: year of first oil. put specific date if available.
- Operator: company undertaking the project.
- Area: onshore (LAND), offshore (OFF), offshore deep water (ODW), tar sands (TAR).
- Type: liquid category (i.e. Natural Gas Liquids, Natural gas condensate, Crude oil)
- Grade: oil quality (light, medium, heavy, sour) or API gravity
- 2P resvs: 2P (proven + probable) oil reserves in giga barrels (Gb).
- GOR: The ratio of produced gas to produced oil, commonly abbreviated GOR.[1]
- Peak year: year of the production plateau/peak.
- Peak: maximum production expected (thousand barrels/day).
- Discovery: year of discovery.
- Capital investment: expected capital cost; FID (Final Investment Decision) - If no FID, then normally no project development contracts can be awarded. For many projects, a FEED stage (Front End Engineering Design) precedes the FID.
- Notes: comments about the project (footnotes).
- Ref: list of sources.
Remove ads
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads