Top Qs
Timeline
Chat
Perspective
PCMC Bhavan metro station
Pune Metro's Purple Line terminal metro station in Pimpri-Chinchwad, India From Wikipedia, the free encyclopedia
Remove ads
PCMC Bhavan is the elevated northern terminal metro station on the North-South corridor of the Purple Line of Pune Metro in Pimpri Chinchwad, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro.[2] From March 2022 to July 2023, the Purple Line operated between PCMC Bhavan and Phugewadi,[3] but from 1 August 2023 the section between Phugewadi and Civil Court metro station came into use, so trains ran from PCMC Bhavan to Civil Court.[4] On 29 September 2024, the launch of Pune Metro Phase I was completed and the Purple Line was fully operational from PCMC to Swargate.[5] An extension has been planned which will move PCMC station's terminal status and extend the line to Nigdi.[6]
Remove ads
Station layout
PCMC Bhavan track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 1 Southbound |
Towards → Swargate Next Station: Sant Tukaram Nagar | |
Platform 2 Northbound |
Towards ← Train Terminates Here | |
Side platform | Doors will open on the left ![]() | ||
L2 | ||
Remove ads
Entry/Exit
![]() | This section is empty. You can help by adding to it. (August 2023) |
Gallery
- Nameboard of PCMC Bhavan metro station.jpg.
- Facade of PCMC Bhavan metro station
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads