Autoroute 35 (A-35) is an Autoroute in the region of Montérégie, Quebec, Canada. With the first section constructed in the 1960s, the A-35 links Saint-Jean-sur-Richelieu with Montreal via the A-10. The A-35 is also the primary route for traffic between Montreal and Boston, although it ends 13.4 km (8.3 mi) short of the U.S. border. South of its current terminus in Saint-Sébastien, the A-35 continues as two-lane Route 133 (which becomes four-lane divided 6.5 km (4.0 mi) north of the border) to the border. An extension of A-35 to meet Interstate 89 at Saint-Armand would have completed a nearly 500 km (310 mi) limited-access highway link between Montreal and Boston.[4] It had been scheduled to open in 2017, but was delayed until 2023,[5] and then delayed again until 2025, with the final segment from the border to 6.5 km (4.0 mi) north of it cancelled in March 2025.[6][7][8] The southernmost section of Route 133 has been a four-lane divided highway for many years, allowing the transition from the newly constructed autoroute to be smooth, although not converted to autoroute standards.
Like many Quebec Autoroutes, the A-35 also has a name: Autoroute de la Vallée-des-Forts (Forts Valley Highway). The name refers to a chain of forts built by the French in the Richelieu Valley during the 17th and 18th centuries to defend their colonial settlements from the Iroquois. The A-35 used to be known as Autoroute de la Nouvelle-Angleterre (New England Motorway), referring to its role as a link between Quebec and New England.
Remove ads
History
Summarize
Perspective

First constructed in the 1960s, A-35 is currently a 40 km (25 mi) long, 4-lane spur route linking Saint-Jean-sur-Richelieu to Autoroute 10. By 1966, 16 km (10 mi) connecting the A-10 in Chambly with Route 104 in Iberville were opened to traffic. Another 3 km (2 mi) of A-35 from Route 104 to its terminus with Route 133 were completed in 1967. Completion of the entire length of A-35 had been scheduled for that year in time for Expo 67, but the province instead focused on expediting construction of autoroutes and approach roads to the Expo site.[9]
For many years, the A-35 featured at-grade intersections with St-Raphael Road and St-Andre Road in Saint-Luc. These intersections were closed in 1999; the St-Andre Road intersection was converted into a partial cloverleaf interchange, while St-Raphael Road was dead-ended on either side of the A-35.
A federal-provincial funding agreement is providing for the completion of the A-35 to Interstate 89 at the U.S. border. The project's objectives are to improve economic links between Quebec and New England, reduce traffic on Route 133 (which is ill-equipped for the traffic it currently carries) and improve quality of life in the region.[4]
Construction of the A-35 extension began in 2009 between Saint-Alexandre and Saint-Sébastien. Construction of the 37.9 km (23.5 mi) extension is divided into four phases. The first sections (both Phase I and Phase II) of new highway between Saint-Jean-sur-Richelieu and Highway 133 to Saint-Sébastien were opened to traffic on October 8, 2014.
On June 10, 2019, Federal and provincial government officials announced plans to extend Quebec's Highway 35 by nearly 9 km (5.6 mi) in the southbound direction (Phase III), extending Highway 35 from Route 133 in Saint-Sébastien to the junction of Route 133 and chemin Champlain and du Moulin in Saint-Armand.[10] This work began in 2020, and by December 2023 the majority of Phase III had been completed, including an overpass for Route 202 over Highway 35 in Pike River.[11] However, the bridge over Rivière-aux-Brochets was not finished for several months due to a supply chain issue with steel beams.[12][13] An overpass with Route 133 passing over Highway 35, an interchange at the junction of Highway 35, Champlain Road and Route 133 at Saint-Armand, and a roundabout built just to the northeast of that at the intersection of Route 133 and Champlain and Moulin roads in Saint-Armand, were opened to traffic on October 11, 2023.[5][14][15][16]The opening is now forecast for September 2025. [14][8]
Remove ads
Future
Phase IV would have completed 4.5 km (2.8 mi) of the project between the intersection of Route 133 and Champlain and du Moulin Roads in Saint-Armand to the U.S. border.[14] However, this project was postponed after being removed from the 2025-2035 Quebec Infrastructure Plan by the Quebec Treasury Board due to budget cuts in March 2025.[7][8]
In addition, the interchange in Saint-Alexandre that was not built as part of Phase II of the extension, which had been planned for the location where Highway 227 crosses Highway 35 on Rang des Dussault, and which was later planned to be moved to the southeast to meet a re-routed Highway 227 that continues southwest from its current intersection at Rang des Soixante and Chemin de la Grande Ligne,[14] was cancelled after being removed from the 2025-2035 Quebec Infrastructure Plan by the Quebec Treasury Board due to budget cuts in March 2025.[7]
If completed, the length of A-35 would increase to 55 km (34 mi).