Top Qs
Timeline
Chat
Perspective

Radium release hitch

From Wikipedia, the free encyclopedia

Radium release hitch
Remove ads

A radium release hitch is a load-releasing hitch using 3:1 mechanical advantage which is used in a two-rope technical rescue system.[1] The Radium Release Hitch allows a load to be transferred from one rope to another and is commonly rigged into the belay line prior to the operation of a two-rope technical rescue system.[2]

Quick Facts Category, Efficiency ...

A radium release hitch is typically tied with 10 meters of 8mm rope and two locking carabiners. A reasonable length for the hitch (distance between the 2 carabiners) is 10 to 15 cm.[3]

Remove ads

History

The Radium Release Hitch was developed by Kirk Mauthner (who lives near Radium Hot Springs, hence the name) as a result of the extensive comparative analysis of release devices undertaken during 1997 through 1999[4]

Usage

  • Passing knots
  • Untensioning a locked lowering device or locked up prussiks.[5]

Tying

  • Tie a figure 8 on a bight at one end of the cord and clip it into the load carabiner on its spine side.
  • Clip the standing part of the rope through the anchor carabiner and back down through the load carabiner; bring the rope back up to the anchor carabiner.
  • Tie a Munter hitch on its gate side of the anchor carabiner. Ensure that the Munter hitch is in the release position with the in-feed rope toward the gate side of the carabiner
  • Secure the Radium Release Hitch using a bight to tie a half hitch on a bight around the entire stem below the Munter hitch, and then back it up with an overhand on a bight knot again around the entire stem.
  • Tie a figure 8 on a bight at the other end, and clip it to a secure anchor.[3][6]

See also

List of knots

Mountain Rescue

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads