Top Qs
Timeline
Chat
Perspective

Red Line (Ahmedabad Metro)

Railway line in Ahmedabad, India From Wikipedia, the free encyclopedia

Remove ads

The Red Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India.

Quick Facts Overview, Status ...

Remove ads

History

Thumb
North-South Corridor under construction near Sabarmati Powerhouse and Sabarmati Railway Station 9 July 2017

The Phase-1 (North-South Corridor) of Ahmedabad Metro consists of 15 metro stations from APMC to Motera Stadium with a total distance of 18.87 km (11.73 mi). The line is completely elevated. It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations.[1] The Phase-1 of the North-South Corridor was inaugurated on 30 September 2022 by Indian Prime Minister Narendra Modi.[2] It was opened to public on 6 October 2022 except Sabarmati Railway Station metro station which is under construction.[3][4]

Remove ads

List of stations

Following is a list of stations on this route:[5][6]

More information #, Station Name ...
Remove ads

Map

Thumb
Click on icons for more details


References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads