River Bend Nuclear Generating Station is a nuclear power station on a 3,300-acre (1,300 ha) site near St. Francisville, Louisiana in West Feliciana Parish, approximately 30 miles (50 km) north of Baton Rouge. The station has one sixth generation General Electric[2] boiling water reactor that has a nominal gross electric output of about 1010 MWe. Commercial operation began on June 16, 1986. In 2003, owners applied and were approved for a power upgrade of approximately 52 megawatts in 2003. The nameplate capacity is 974 MW.[3]
Remove ads
River Bend is operated by Entergy, which owns 100% of the station through its subsidiary, Entergy Gulf States Louisiana. The plant's operating license will expire in 2045.[4]
The Site Vice President is Phil Hansett, the General Manager of Plant Operations is Bruce Chenard, and the Senior Operations Manager is Danny James. The station employs 870 full time employees.[3]
Remove ads
Units 2 and 3
The River Bend site was originally designed to have two identical units. Construction on Unit 1 began in 1973, but Unit 2 barely broke ground, with only the containment base mat and some underground piping installed. In 1984, plans to construct Unit 2 were officially abandoned.[5]
On September 25, 2008, Entergy filed a Combined Construction and Operating License (COL) application with the Nuclear Regulatory Commission (NRC) for Unit 3, a new nuclear reactor at River Bend. The 1550 MWe Economic Simplified Boiling Water Reactor (ESBWR) was the selected design.[6][7] The reactor's cost was estimated at $6.2 billion.[8]
On January 9, 2009, Entergy indefinitely postponed work towards the license and construction of Unit 3.
Remove ads
Electricity production
Remove ads
Surrounding population
The Nuclear Regulatory Commission defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[10]
The 2010 U.S. population within 10 miles (16 km) of River Bend was 23,466, an increase of 11.1 percent in a decade, according to an analysis of U.S. Census data for msnbc.com. The 2010 U.S. population within 50 miles (80 km) was 951,103, an increase of 11.2 percent since 2000. Cities within 50 miles include Baton Rouge (25 miles to city center).[11]
Seismic risk
The Nuclear Regulatory Commission's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at River Bend was 1 in 40,000, according to an NRC study published in August 2010.[12][13]
Safety record
Unlike the Waterford Nuclear Generating Station downriver in Hahnville, River Bend continued operation throughout Hurricane Katrina in 2005. The plant was shut down during Hurricane Gustav in 2008.[8]
On May 21st, 2025, the plant was shut down in order to repair a reactor coolant system leak (greater than 2 gallons per minute) that was later identified as coming from a leaking valve. The valve was fixed and the plant restarted May 26th. Reported blackouts that occurred in southern Louisiana were originally blamed on the plant "unexpectedly tripping," but that was not the case - the grid operator had been notified that River Bend needed to shut down to repair a leak, and why they were not able to maintain the grid is still under investigation [14].
Remove ads
See also
- Nuclear Power 2010 Program
- Waterford Nuclear Generating Station, in St. Charles Parish, Louisiana
Notes
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads