Top Qs
Timeline
Chat
Perspective
S7 (Munich)
Rail line in Bavaria, Germany From Wikipedia, the free encyclopedia
Remove ads
Line S7 is a line on the Munich S-Bahn network. It is operated by DB Regio Bayern. It runs from Wolfratshausen via Höllriegelskreuth, to München Hauptbahnhof (central station).
S7: stations and transfer opportunities |
---|
Source: German railway atlas[1] |
The line is operated at 20-minute intervals between Höllriegelskreuth and Hauptbahnhof. Two out of three trains an hour continue from Höllriegelskreuth to Wolfratshausen, so that the gap between trains alternates between 20 and 40 minutes. It is operated using class 423 four-car electrical multiple units, usually as two coupled sets. In the evenings and on Sundays they generally run as single sets.
The line runs over lines built at various times:
- from Wolfratshausen to a point to the north of Grosshesselohe Isartal station on the Isar Valley Railway, opened by the Lokalbahn AG company (LAG) on 27 July 1891 and electrified from Wolfratshausen to Höllriegelskreuth in May 1960 and from Höllriegelskreuth to Grosshesselohe Isartal at 580 volts DC and converted to 15 kV AC on 27 September 1957[2][3]
- from a point to the north of Grosshesselohe Isartal station to a point southwest of München Donnersbergerbrücke station on the Munich–Holzkirchen railway opened on 24 June 1854 as part of the Bavarian Maximilian's Railway[4] and electrified on 27 September 1957[3]
- the Southern lines tunnel (Südstreckentunnel) to Donnersbergerbrücke station, opened on 31 May 1981[5]
- from Donnersbergerbrücke to the beginning of the S-Bahn trunk line over tracks running parallel to the Munich–Augsburg railway, opened by the Munich–Augsburg Railway Company on 1 September 1839[6]
S-Bahn services commenced on 28 May 1972 as S-Bahn line 10 between Wolfratshausen and service from Wolfratshausen to Holzkirchen wing station (Holzkirchner Flügelbahnhof) of Munich Hauptbahnhof as they could not yet continue through the S-Bahn trunk line tunnel because the so-called southern lines tunnel (Südstreckentunnel), which passes under the long-distance tracks towards Pasing and the S-Bahn trunk line, was not yet available. With the opening of the southern lines tunnel on the S-Bahn route on 31 May 1981, the S-Bahn line from Wolfratshausen continued on the S-Bahn trunk line; as a result it was renamed as line
(as single digit numbers were reserved for lines that ran through the trunk line tunnel).[7] Line
took over the section of
from Munich East to Kreuzstraße. In December 2024 the line was splitted into
now again terminating at Hauptbahnhof and
running from Pasing to Kreuzstraße.
Remove ads
Notes
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads