Top Qs
Timeline
Chat
Perspective
STS-61-M
Canceled Space Shuttle mission From Wikipedia, the free encyclopedia
Remove ads
STS-61-M was a proposed NASA Space Shuttle program mission, planned for July 1986 but canceled following the Space Shuttle Challenger disaster (STS-51-L).
The payload manifest was to have been TDRS-D, INSAT-1C, and EOS-1 (Electrophoresis Operations in Space).[1] EOS-1 was a payload developed by McDonnell Douglas that would have demonstrated the production in space of ultra-pure erythropoietin through electrophoresis.[2] Robert Wood, a McDonnell Douglas engineer, was assigned as the payload specialist for EOS-1 with fellow engineer Charles D. Walker assigned as his backup.[3]
If flown, this would have been Sally Ride's third spaceflight. After the Challenger disaster, Ride was named to the Rogers Commission investigating the disaster and left NASA afterwards in 1987.[4]
Remove ads
Primary Crew
Remove ads
Backup Crew
See also
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads