Top Qs
Timeline
Chat
Perspective

STS-61-M

Canceled Space Shuttle mission From Wikipedia, the free encyclopedia

STS-61-M
Remove ads

STS-61-M was a proposed NASA Space Shuttle program mission, planned for July 1986 but canceled following the Space Shuttle Challenger disaster (STS-51-L).

Quick Facts Names, Mission type ...

The payload manifest was to have been TDRS-D, INSAT-1C, and EOS-1 (Electrophoresis Operations in Space).[1] EOS-1 was a payload developed by McDonnell Douglas that would have demonstrated the production in space of ultra-pure erythropoietin through electrophoresis.[2] Robert Wood, a McDonnell Douglas engineer, was assigned as the payload specialist for EOS-1 with fellow engineer Charles D. Walker assigned as his backup.[3]

If flown, this would have been Sally Ride's third spaceflight. After the Challenger disaster, Ride was named to the Rogers Commission investigating the disaster and left NASA afterwards in 1987.[4]

Remove ads

Primary Crew

More information Position, Astronaut ...
Remove ads

Backup Crew

More information Position, Astronaut ...

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads