Top Qs
Timeline
Chat
Perspective

Saraighat Express

Train in India From Wikipedia, the free encyclopedia

Saraighat Express
Remove ads

The 12345 / 12346 Saraighat SF Express[1] is a daily Superfast Express train which runs between Howrah Junction, Kolkata (West Bengal) and Guwahati (Assam), via Barddhaman, Malda Town near Malda, New Jalpaiguri Junction near Siliguri & New Bongaigaon Junctionwith stops at Barddhaman, Bolpur(Shantiniketan), Sainthia, Rampurhat, Pakur, New Farakka Junction, Malda Town, Kishanganj, New Jalpaiguri Junction, Dhupguri, Falakata, New Cooch Behar, New Alipurduar, New Bongaigaon Junction & Kamakhya Junction(now Shri Mata Kamakhya Dham Junction).[2] Saraighat SF Express is one of the fastest trains that connects Kolkata to the North East, and gets high priority end to end. The train is named after Battle of Saraighat between Ahom & Mughal & after the Saraighat Bridge. Funnily & Shockingly from 2001 onwards Saraighat Express doesn't run via Saraighat Bridge but via Naranarayan Setu using New Bongaigaon Junction - Goalpara Town - Kamakhya Junction(now Shri Mata Kamakhya Dham Junction) line.

Quick facts Overview, Service type ...
Remove ads

History

Summarize
Perspective

The service was started in 6 July 1995; 30 years ago (1995-07-06) as 3045/3046 Saraighat Express with stops at Barddhaman, Bolpur(Shantiniketan), Sainthia, Rampurhat, Pakur, New Farakka Junction, Malda Town, Kishanganj, New Jalpaiguri Junction,New Cooch Behar, New Alipurduar, New Bongaigaon Junction & Rangiya Junction until 1998. From 2001, it was permanently diverted to run via Naranarayan Setu using New Bongaigaon Junction - Goalpara Town - Kamakhya Junction(now Shri Mata Kamakhya Dham Junction) line. Saraighat Express doesn't run via Saraighat Bridge, on which is it named. It was covering 975.4 km (606 mi) in 18 hrs running at 54.16 km/h (34 mph) speed. [3]. In 2001 after permanent diversion via Naranarayan Setu using New Bongaigaon Junction - Goalpara Town - Kamakhya Junction(now Shri Mata Kamakhya Dham Junction) line, number was changed to 2345/2346. Timings were preponed by 5 hrs 30 mins making it 15.40 pm to 09.40 am train in both ways, covering 1,000.3 km (622 mi) in 18 hrs running at 55.57 km/h (35 mph) speed.[4]. Before electrification in 2001-2011 period, the WDM-3 diesel locomotive from Howrah shed used to haul the train till Malda Town & then WDM-3 diesel locomotive from Malda Town shed used to haul the train till Guwahati. From 2011-2018, the train was hauled fully end to end by WDP-4 diesel locomotive of Siliguri Junction railway station shed. Full electrification reached Guwahati on 2018 & from then on WAP-7 electric locomotive from Howrah shed & recently WAP-7 electric locomotive from Siliguri Junction railway station shed hauls this train end to end. It is the 2nd train to get Electric Locomotive end to end from Guwahati after the North East Express.

Remove ads

Coach composition

This train has 22 LHB coaches.[5]

Howrah to Guwahati

More information Loco ...

Guwahati to Howrah

More information Loco ...

Please note that one of the rakes of this train has the exact opposite coach composition of what is mentioned.


Remove ads

Traction

The train is hauled by a WAP-7 locomotive from Howrah Junction shed & recently is also hauled by WAP-7 locomotive from Siliguri Junction railway station shed

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads