Shardul-class tank landing ship

Indian Navy amphibious warfare vessel From Wikipedia, the free encyclopedia

Shardul-class tank landing ship

Shardul-class (lit.'Tiger') landing ships are large amphibious warfare vessels built by Garden Reach Shipbuilders and Engineers for the Indian Navy. They are an evolution of the Magar-class amphibious landing ships. Initially, the ship was classified as Landing Ship Tank (Large) or LST(L). The class has an indigenous content of over 90%.[1] The ships also carry four landing craft vehicle personnel (LCVP) on board, which can be used for the landing of troops.[2]

Quick Facts Class overview, General characteristics ...
Thumb
INS Airavat (L24) sails out of Visakhapatnam harbour after commissioning
Class overview
NameShardul class
BuildersGarden Reach Shipbuilders and Engineers
Operators Indian Navy
Preceded byMagar class
Completed3
Active3
General characteristics
TypeTank landing ship
Displacement5,650 tons
Length125 m (410 ft)
Beam17.5 m (57 ft)
Draught4 m (13 ft)
PropulsionKirloskar PA6 STC engines
Speed16 kn (30 km/h; 18 mph)
Boats & landing
craft carried
4 × LCVPs
Capacity
  • 11 MBT, 10 armoured vehicles
  • 465.8 m3 (16,450 cu ft) water, 1,292.6 m3 (45,650 cu ft) diesel fuel
Troops500
Complement11 officers, 145 sailors
Electronic warfare
& decoys
Decoy: Chaff launchers
Armament
  • 2 × WM-18 rocket launchers
  • 4 × CRN-91 AA (Naval 30 mm Medak) guns, MANPAD's.
Aircraft carried1 Sea King/HAL Dhruv
Close

History

The order for the vessels were placed in December 2001 while the contract was signed in early 2002.[1]

The ship is equipped with WM-18 140 mm rocket launchers, developed by DRDO and manufactured by Larsen & Toubro. Two units of the system is integrated with one each on port and starboard. The rocket launcher has 18 tubes in a configuration of 6×3. These are used for beach clearing operations before initiating amphibious operations. The armament also includes four CRN-91 autocannons for self-defence.[3][4][5]

Shardul was the first vessel commissioned at Karwar Naval Base, INS Kadamba. The second ship Kesari was commissioned at the Visakhapatnam Naval Base,[6] and later moved to Port Blair.[7] The third ship Airavata underwent sea trials in 2008 and was commissioned in 2009.[8][9][10]

Ships

More information Name, Pennant Number ...
NamePennant Number Laid down[1] Launched[1]CommissionedHomeportStatus
 Indian Navy
Shardul L16 16 December 2002 3 April 2004 4 January 2007 Karwar Active
Kesari L15 8 June 2005 5 April 2008 Port Blair
Airavat L24 27 March 2006 19 May 2009 Visakhapatnam
Close

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.