Top Qs
Timeline
Chat
Perspective
Solar power in South Carolina
From Wikipedia, the free encyclopedia
Remove ads
Solar power in South Carolina is rapidly becoming competitive with grid electricity, due to the decrease in cost and the eight-year extension to the 30% federal tax credit, which can be used to install any size system.[1] South Carolina offers a 25% tax credit, meaning that 55% of the cost is covered through tax credits.[2]


South Carolina's largest solar installation was the 311 kW Grand Strand Solar Station array in Myrtle Beach, completed on April 18, 2011,[3] until December 2, 2011, when Boeing completed covering the roof of their 787 assembly building with a 2.6 MW solar array, sufficient for 20% of the building's energy use.[4][5]

- Source: NREL[6]
Remove ads
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads
