Top Qs
Timeline
Chat
Perspective

Surat Bus Rapid Transit System

From Wikipedia, the free encyclopedia

Remove ads

The Sitilink or Surat BRTS is an integrated bus rapid transit and public bus transport system for Surat, Gujarat, India. It has been operational since 26 January 2014 by Surat Municipal Corporation.[1][2][3][4][5][6][7]

Quick Facts Overview, Locale ...
Remove ads

Corridors

Phase 1

The Two corridors have been completed in Phase 1.

  • Corridor 1: Udhana Darwaja to Sachin GIDC Naka [10.20 km (6.34 mi)]
  • Corridor 2: ONGC Colony – Canal Road – Sarthana Jakat Naka [19.70 km (12.24 mi)]

Phase 2

Phase 2 consists of nine corridors, out of which most of the corridors have already been completed.

  • Corridor 3: Adajan Patiya to Jahangirpura
  • Corridor 4: Adajan Patiya to Pal R.T.O.
  • Corridor 5: Pal R.T.O. to ONGC Colony
  • Corridor 6: Anuvrat Dwar to St. Thomas School Junction
  • Corridor 7: St. Thomas School Junction to Daksheshwar Mahadev Junction (Connect to Phase-I)
  • Corridor 8: Dindoli Varigruh to Hirabaug/Gajera Circle
  • Corridor 9: Hirabaug to Lake Garden
  • Corridor 10: Gajera Circle to Jahangirpura
  • Corridor 11: Katargam Darwaja to Kosad

Routes

More information Route No., Route ...

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads