UK oil pipeline network
United Kingdom legislation From Wikipedia, the free encyclopedia
Remove ads
The United Kingdom petroleum pipeline network is principally made up of three pipelines systems: the former Government Pipeline and Storage System (GPSS) now the Exolum Pipeline System; the Esso pipelines (principally the mainline and midlines), and the United Kingdom Oil Pipelines (UKOP) and associated pipelines. There are also several other lines including the Fina line built around 1990 that runs from North Lincolnshire to the Buncefield oil depot near Hemel Hempstead.[1]
Oil pipeline network in England
Remove ads
GPSS
The GPSS was originally constructed between 1941 and 1944 and then extended after the war, most notably during the 1950s, 1970s and 1980s.[1] The first commercial pipeline to be constructed in the United Kingdom was built in 1959 by Shell-Mex and BP from the GPSS depot at Walton on Thames to Heathrow Airport. This pipeline now forms part of UKOP (West London). In 1963 Esso built their own pipeline from their Fawley refinery to London Heathrow.[2] The Esso Main and Midlines constructed in the 1970s and 1980s respectively. A section of the Esso Fawley to London pipeline, between Boorley Green, Eastleigh and Hounslow, was replaced between 2021 and 2023.[3] For a further description see Exolum Pipeline System.
Remove ads
UKOP
Summarize
Perspective
The United Kingdom Oil Pipeline (UKOP) is an oil products pipeline opened in 1969 and connecting the two (then) Shell refineries of Stanlow (Cheshire) and Shell Haven (Thames Estuary). UKOP is owned by a consortium of five shareholders Essar Midlands Ltd, BP, Shell, Valero and Total. UKOP is administered and operated by the British Pipeline Agency (BPA),[4] which is jointly owned by Shell and BP.[5] As part of the UKOP network, in 1982 BPA began work a pipeline from Walton to Gatwick and this was substantively complete by the end of the year. However, in 1983 the pipeline had to be shut down and was not brought back into operation until 1984.[6] In 1985 the UKOP pipeline from Kingsbury to Buncefield was commissioned.[7]
UKOP transports 7.5 million tonnes of mixed products each year distributed to major oil terminals at Buncefield and Kingsbury with spurs to Northampton and Nottingham. UKOP now draws its products from Essar Stanlow[8] in the north, with smaller volumes from tankage at Shell Haven. UKOP carries two grades of petrol, two grades of kerosene (including Jet A-1) and two grades of gas oil-diesel.
To ensure safety and integrity, the pipeline is patrolled by helicopter every two weeks.
Remove ads
Petroleum product pipelines
Summarize
Perspective
A list of UK petroleum pipelines. Pipelines are multi-product lines with batches of product separated by pigs, except for single product lines where shown, for example aviation kerosene.
Remove ads
Crude oil pipelines
Summarize
Perspective
In addition to the petroleum products pipelines there are a number of crude oil pipelines transporting crude oil from offshore installations to coastal terminals and from terminals to refineries.[13][14][15][16] The sources give various and conflicting lengths and capacities.
Remove ads
See also
For details of UK gas pipelines see National Transmission System
References
Further reading