Top Qs
Timeline
Chat
Perspective
USS Ralph Johnson
Arleigh Burke-class destroyer From Wikipedia, the free encyclopedia
Remove ads
USS Ralph Johnson (DDG-114) is an Arleigh Burke-class (Flight IIA Restart) Aegis guided missile destroyer of the United States Navy. She was commissioned on 24 March 2018.
Remove ads
Construction and career
Summarize
Perspective
The contract to build the destroyer was awarded on 26 September 2011 to Ingalls Shipbuilding of Pascagoula, Mississippi.[7][8] On 15 February 2012, Secretary of the Navy Ray Mabus announced the ship was to be named Ralph Johnson in honor of Marine Ralph H. Johnson, who was posthumously awarded the Medal of Honor for shielding two fellow Marines from a grenade in March 1968 during the Vietnam War.[9][10][11] The contract was worth $697.6 million fixed price, and was also the 30th Arleigh Burke-class destroyer contract issued to Ingalls Shipbuilding.[12]
Ralph Johnson is the 64th ship of the Arleigh Burke class of destroyers, the first of which, USS Arleigh Burke, was commissioned in July 1991.[13] With 75 ships planned to be built in total, the class has the longest production run for any U.S. Navy surface combatant.[14] As an Arleigh Burke-class ship, Ralph Johnson's roles included anti-aircraft, anti-submarine, and anti-surface warfare, as well as strike operations.[6] During the long production run, the class was built in three flights—Flight I (DDG-51–DDG-71), Flight II (DDG-72–DDG-78), and Flight IIA (DDG-79– ).[15] Ralph Johnson is a Flight IIA ship, and as such, features several improvements in terms of ballistic missile defence, an embarked air wing, and the inclusion of mine-detecting ability.[6]
In 2008, the U.S. Navy decided to restart production of the Arleigh Burke class as the number of orders for the Zumwalt-class destroyer was reduced from ten to three.[16][17] The first three ships (DDG-113—DDG-115) ordered following the product decision are known as the "restart" ships, while "technology insertion" ships (DDG-116—DDG-123) are expected to incorporate certain elements of Arleigh Burke class Flight III, which in turn will run from DDG-124 onwards.[18] As a "restart" ship, Ralph Johnson primarily features upgraded electronics; she was originally scheduled to be delivered in August 2016,[18] but construction was delayed and delivery was rescheduled for late 2017 after sea trials were completed in the middle of the year.[19]
The warship arrived at the Port of Charleston's Columbus Street Terminal on 19 March 2018[20] and was commissioned on 24 March.[5]
In 2019, Ralph Johnson's homeport shifted to Yokosuka, Japan, replacing USS Mustin.[21]
On 4 September 2023, Ralph Johnson conducted a bilateral sail with BRP Jose Rizal of the Philippine Navy in the South China Sea.[22]
Remove ads
Awards
- Battle "E" – (2020)
- Chief of Naval Operations (CNO) Ship-Helicopter Safety Award - (2020)
- Retention Excellence Award - (2020) [23]
Gallery
- USS Ralph Johnson being launched 12 December 2015
- Christening of USS Ralph Johnson on 2 April 2016
- USS Ralph Johnson's sea trial on 18 July 2017
- USS Ralph Johnson on 27 April 2018
- USS Ralph Johnson on 24 April 2020
- USS Ralph Johnson arrives in Singapore on 4 August 2023
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads