Uppudaluwa Wind Farm
From Wikipedia, the free encyclopedia
Remove ads
The Uppudaluwa Wind Farm (also known as PowerGen Lanka Wind Farm, after its developers) is a 10.5 MW wind farm owned by PowerGen Lanka (Private) Limited in Uppudaluwa, Puttalam, Sri Lanka.
The project agreement was signed with the Board of Investment in August 2010, with construction of the wind farm commencing in the following month. The project was commissioned in June 2011, with a total cost of US$18.55 million.[1][2][3][4][5] The plant is estimated to generate 26.28 GWh annually.[6][7]
Remove ads
Wind turbines
The plant utilizes seven Leitner Shriram LTW-77-1.5 1.5 MW wind turbines, spaced approximately 260 m (850 ft) apart on the southernmost shore of the Puttalam Lagoon.[6] The turbine foundations were built by the International Construction Consortium at a cost of Rs.121 million (approximately US$930,000).[8]
Remove ads
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads