VIPER (Volatiles Investigating Polar Exploration Rover) is a lunar rover which was developed at the NASA Ames Research Center. Before the project was cancelled in 2024 the rover would have been tasked with prospecting for lunar resources in permanently shadowed areas of lunar south pole region, especially by mapping the distribution and concentration of water ice. The mission built on a previous NASA rover concept, the Resource Prospector, which had been cancelled in 2018.[8]

Quick Facts Names, Mission type ...

VIPER was to be carried aboard Astrobotic's Griffin lander as part of NASA's Commercial Lunar Payload Services (CLPS) initiative.[9]

In 2025, NASA released an Announcement for Partnership Proposal seeking U.S. companies to deliver and operate the completed VIPER rover on the Moon.[10]

Remove ads

Cancellation in 2024

Thumb
NASA's VIPER assembled at Johnson Space Center, when it was canceled

Amidst cost growth and delays to readiness of the rover and the Griffin lander, the VIPER program was ended in July 2024, with the rover planned to be disassembled and its instruments and components reused for other lunar missions. Before commencing disassembly, NASA announced they would consider "expressions of interest" from industry to use the "VIPER rover system at no cost to the government."[6] At the time of the announcement NASA expected to save $84 million by canceling the mission, which has cost $450 million so far.[11] The budgeted cost to build VIPER was $433.5 million, with $235.6 million budgeted to launch the lander.[12] The agency still plans to support the Griffin lander to arrive on the Moon in fall of 2025, though with a mass simulator in place of the VIPER rover.[13] NASA expects the primary objectives of VIPER to be fulfilled by an array of other missions planned for the next several years, but these may eventually become overshadowed and forgotten over time.[12]

Remove ads

Response to cancellation

Summarize
Perspective

VIPER's abrupt cancellation was received poorly by the scientific community. At the time of its cancellation, VIPER had been fully assembled and completed vibration testing.[14] In response, a letter opposing the cancellation was circulated and garnered over 2500 signatures by the end of July 2024.[15] In August 2024, The Planetary Society published a statement calling for the program to be reconsidered.[16] On September 6th 2024, the House Committee on Science, Space, and Technology published a letter requesting additional information as to why NASA cancelled the mission. [17]

Post-cancellation developments

In February 2025, NASA announced a new approach to potentially revive the VIPER mission through an industry partnership. The agency released an Announcement for Partnership Proposal seeking U.S. companies to deliver and operate the completed VIPER rover on the Moon. Under the proposed partnership, NASA would provide the already-built VIPER rover while the selected company would be responsible for the launch, landing, and surface operations, including data collection and dissemination, as well as all mission costs.[10] As of May, 2025, discussions are still ongoing but collapsed.

With the potential cuts from the second Donald Trump administration looming, the future of VIPER remains unclear. It is possible that the VIPER mission could be scrapped, and the team behind it face dismissal, and the VIPER name to be reused in unrelated contexts.

Thumb
Artist's conception of the VIPER rover on the Moon (Image courtesy of NASA Ames Research Center)
Remove ads

Objectives

Summarize
Perspective
Thumb
Orbital survey of the Moon taken by the Moon Mineralogy Mapper instrument on India's Chandrayaan-1 orbiter. Blue shows the spectral signature of hydroxide, green shows the brightness of the surface as measured by reflected infrared radiation from the Sun and red shows a mineral called pyroxene.
Thumb
The image shows the distribution of surface ice at the Moon's south pole (left) and north pole (right) as viewed by NASA's Moon Mineralogy Mapper (M3) spectrometer onboard India's Chandrayaan-1 orbiter.

The VIPER rover has a size similar to a golf cart (around 1.4 × 1.4 × 2 m), and would have been tasked with prospecting for lunar resources, especially for water ice, mapping its distribution, and measuring its depth and purity.[1][2] The water distribution and form must be better understood before it can be evaluated as a potential resource within any evolvable lunar or Mars campaign.[18]

Thumb
Proposed landing site of the Volatiles Investigating Polar Exploration Rover (VIPER)

The VIPER rover was to operate on the western edge of Nobile crater on Mons Mouton in the Moon's south pole region.[7][19] The first ever rover with its own lighting source,[20] it was planned to rove several kilometers, collecting data on different kinds of soil environments affected by light and temperature—those in complete darkness, occasional light and in constant sunlight.[21][2] In permanently shadowed locations, it would operate on battery power alone and would not be able to recharge them until it drives to a sunlit area. Its total operation time was planned to be 100 Earth days.[1][2][3]

Project management

The VIPER rover was part of the Lunar Discovery and Exploration Program managed by the Science Mission Directorate at NASA Headquarters, and was meant to support the crewed Artemis program.[2] NASA's Ames Research Center was managing the rover project. The hardware for the rover was designed by the Johnson Space Center, while the instruments were provided by Ames, Kennedy, and Honeybee Robotics.[2] The project manager was Daniel Andrews,[2][22] and the project scientist was Anthony Colaprete, who was implementing the technology developed for the now cancelled Resource Prospector rover.[23] The estimated cost of the mission was US$250 million in October 2019.[3] NASA said on 3 March 2021 that the new lifecycle cost for the mission was US$433.5 million.[24]

Both the launcher and the lander were competitively provided through Commercial Lunar Payload Services (CLPS) contractors, with Astrobotic providing the Griffin lander to deliver the rover, and SpaceX providing the Falcon Heavy launch vehicle.[25] NASA was aiming to land the rover in September 2025 until the mission was canceled on 17 July 2024.[6][26]

Remove ads

Rover assembly and preparation for launch

In February 2024 the final instrument, the TRIDENT drill, was installed into the rover.[27] Later on 28 February 2024, VIPER Project Manager Dan Andrews announced that all the rover's scientific instruments were installed, and that it was more than 80% built.[28] Further progress was reported in April 2024, remaining on track for launch later in the year.[29] The rover moved to the environmental testing phase in May.[30]

Remove ads

Science background

Summarize
Perspective

Data obtained by Lunar Prospector,[31] Lunar Reconnaissance Orbiter, Chandrayaan-1, and the Lunar Crater Observation and Sensing Satellite, revealed that lunar water is present in the form of ice near the lunar poles, especially within permanently shadowed craters in the south pole region,[32][33] and present in the form of hydrated minerals in other high-latitude locations.[34]

Water may have been delivered to the Moon over geological timescales by the regular bombardment of water-bearing comets, asteroids and meteoroids,[35] or continuously produced in situ by the hydrogen ions (protons) of the solar wind impacting oxygen-bearing minerals.[31] The physical form of the water ice is unknown, but some studies suggest that it is unlikely to be present in the form of thick, pure ice deposits, and may be a thin coating on soil grains.[36][37][33]

If it is possible to mine and extract the water molecules (H
2
O
) in large amounts, it can be broken down to its elements, namely hydrogen and oxygen, and form molecular hydrogen (H
2
) and molecular oxygen (O
2
) to be used as rocket bi-propellant or produce compounds for metallurgic and chemical production processes.[38] Just the production of propellant, was estimated by a joint panel of industry, government and academic experts, identified a near-term annual demand of 450 metric tons of lunar-derived propellant equating to 2450 metric tons of processed lunar water, generating US$2.4 billion of revenue annually.[39]

Remove ads

Science payload

Summarize
Perspective

The VIPER rover will be equipped with a drill and three analyzers. The Neutron Spectrometer System (NSS), will detect sub-surface water from a distance, then, VIPER will stop at that location and deploy a 1 m (3 ft 3 in) drill called TRIDENT to obtain samples to be analyzed by its two onboard spectrometers:[2][3][40]

Thumb
The NIRVSS instrument
More information Instrument name, Abbr. ...
Remove ads

See also

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads