Top Qs
Timeline
Chat
Perspective
Vijayawada Bus Rapid Transit System
Bus system in India From Wikipedia, the free encyclopedia
Remove ads
The Vijayawada BRTS is a bus rapid transit system for the city of Vijayawada.[1] Six BRTS corridors were proposed under JNNURM at a cost of ₹450 crore (US$53 million). [2]
Remove ads
Corridors

There are six corridor for Vijayawada Bus Rapid Transist system are listed below: Minimum route is of Bus terminal to City bys complex with length of 2.62 km and longest route is bus terminal to city bus terminal (round trip) (via Ramavarappadu Ring road junction, Benz circle) with length of 15.50 km.
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads