Top Qs
Timeline
Chat
Perspective

Vijayawada Bus Rapid Transit System

Bus system in India From Wikipedia, the free encyclopedia

Vijayawada Bus Rapid Transit System
Remove ads

The Vijayawada BRTS is a bus rapid transit system for the city of Vijayawada.[1] Six BRTS corridors were proposed under JNNURM at a cost of 450 crore (US$53 million). [2]

Quick Facts Overview, Area served ...
Remove ads

Corridors

Thumb
BRTS road near Gunadala

There are six corridor for Vijayawada Bus Rapid Transist system are listed below: Minimum route is of Bus terminal to City bys complex with length of 2.62 km and longest route is bus terminal to city bus terminal (round trip) (via Ramavarappadu Ring road junction, Benz circle) with length of 15.50 km.

More information Corridors, Route ...

References

Loading related searches...

Wikiwand - on

Seamless Wikipedia browsing. On steroids.

Remove ads