Cileunyi-Sumedang-Dawuan Toll Road or Cisumdawu Toll Road is a toll road in West Java, Indonesia, which was opened on 11 July 2023, thereby reducing the trip durations of Bandung-Cirebon to around 1 hour, Bandung-Kertajati to 40 minutes, and Cirebon-Kertajati to 20 minutes.[1]
Cileunyi-Sumedang-Dawuan Toll Road | |
---|---|
Cisumdawu Toll Road | |
Route information | |
Part of AH2 | |
Maintained by Citra Karya Jabar Tol (CKJT) | |
Length | 60.3 km (37.5 mi) |
Existed | 2011–present |
History | Section I completed and opened on January 2022 Section II and III completed and opened on December 2022 Others completed and opened on July 2023 |
Major junctions | |
Southwest end | Cileunyi Interchange |
Major intersections | |
Northeast end | Kertajati Interchange |
Location | |
Country | Indonesia |
Major cities | |
Highway system | |
This will be the only toll road in Indonesia that has two tunnel length of 472 metres (1,549 ft) each and a diameter of 14 metres (46 ft) in Section II.[2][3][4] The toll road will pass through Cileunyi, Tanjung Sari, Sumedang, Cimalaka, Legok, Ujung Jaya and Kertajati. This toll road will connect Padaleunyi Toll Road with Cikopo-Palimanan Toll Road. The toll road will connect Bandung with Kertajati International Airport, which opened in 2018.[5]