Confederation Line
Light metro line in Ottawa, Ontario / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Confederation Line?
Summarize this article for a 10 year old
The Confederation Line (French: Ligne de la Confédération), also called O-Train Line 1 (French: Ligne 1 de l'O-Train),[3] is a light rail line operated by OC Transpo in Ottawa, Ontario, Canada, as part of the city's O-Train light rail system. It opened on September 14, 2019, and is O-Train's second line. It operates on an east–west route, with a segment under Queen Street in the downtown core, complementing the north–south Trillium Line that operates to the west of the downtown core.[4] Using light rail rolling stock and technology (e.g. pantograph electrical pickup from overhead catenary rather than a third rail), the Confederation Line is completely grade separated.
Confederation Line | |
---|---|
Overview | |
Owner | City of Ottawa |
Line number | 1 |
Locale | Ottawa, Ontario |
Stations | 13 |
Website | Confederation Line (Line 1) |
Service | |
Type | Light rail |
System | O-Train |
Operator(s) | OC Transpo |
Depot(s) | Belfast Yard |
Rolling stock | Alstom Citadis Spirit |
Daily ridership | 159,000 (avg. weekday, Q4 2019)[1] |
History | |
Opened | September 14, 2019; 4 years ago (2019-09-14)[2] |
Technical | |
Line length | 12.5 km (7.8 mi) |
Character | At-grade, underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 1,500 V DC from overhead catenary |
Operating speed | 25–80 km/h (16–50 mph) |
Signalling | Thales SelTrac CBTC |
The project was approved by the Ottawa City Council and the contract was awarded in December 2012.[5] Construction began in 2013.[6] At a cost of just over CA$2.1 billion, the first stage of the line was the largest infrastructure project awarded in the history of the city before being surpassed by the Stage 2 extension of the line, which will cost $4.66 billion.[7][8][9]