USS Skate (SSN-578)
Submarine of the United States / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about USS Skate (SSN-578)?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
For other ships with the same name, see USS Skate.
USS Skate (SSN-578) was the third submarine of the United States Navy named for the skate, a type of ray, was the lead ship of the Skate class of nuclear submarines. She was the third nuclear submarine commissioned, the first to make a completely submerged trans-Atlantic crossing, the second submarine to reach the North Pole, and the first to surface there.
This article needs additional citations for verification. (September 2009) |
Quick Facts History, United States ...
Skate with an ice pack behind her | |
History | |
---|---|
United States | |
Name | USS Skate |
Ordered | 18 July 1955 |
Builder | Electric Boat |
Laid down | 21 July 1955[1] |
Launched | 16 May 1957[1] |
Sponsored by | Mrs Lewis L. Strauss[1] |
Commissioned | 23 December 1957 |
Decommissioned | 12 September 1986 |
Stricken | 30 October 1986 |
Homeport | New London, Connecticut, Submarine Tender USS Fulton (AS-11) |
Fate | Disposed of by submarine recycling 6 March 1995 |
General characteristics | |
Class and type | Skate-class submarine |
Displacement |
|
Length | 267 ft 7 in (81.56 m) |
Beam | 25 ft (7.6 m) |
Propulsion | S3W reactor[2] |
Speed |
|
Complement | 8 officers and 76 men |
Armament | 8× 21 in (530 mm) torpedo tubes (6 forward, 2 aft) |
Close