Bommanahalli metro station
Namma Metro's Yellow Line metro station From Wikipedia, the free encyclopedia
Remove ads
Bommanahalli (also known as Roopena Agrahara) is an elevated metro station on the North–South corridor of the Yellow Line of Namma Metro in Bangalore, India.
Remove ads
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Bommanahalli metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]
Remove ads
Station layout
Bommanahalli track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms ** Under Construction |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Delta Electronics Bommasandra Next Station: Hongasandra | |
Platform 1 Northbound |
Towards ← Rashtreeya Vidyalaya Road Next Station: Central Silk Board Change at the next station for Blue Line | |
Side platform | Doors will open on the left ![]() | ||
L2 | ||
Remove ads
Entry/Exits
![]() | This section is empty. You can help by adding to it. (December 2024) |
Gallery
Here are some of the metro station captures shown below:-
- This metro station U/C as of September 2023
- Final Stages of this metro station as of December 2023
- Installation of station nameboard as of April 2024
- This metro station ready for operations as of July 2025