Singasandra is an elevated metro station on the north–south corridor of the Yellow Line of Namma Metro in Bengaluru, India.
Remove ads
History
In December 2016, the Bangalore Metro Rail Corporation Limited (BMRCL) issued a call for bids to construct the Singasandra metro station along the 6.385 km Reach 5 – Package 2 section (Hosa Road - Bommanahalli) of the 18.825 km Yellow Line of Namma Metro. On 25 April 2017, ITD-ITD Cementation JV was selected as the lowest bidder for this stretch, with their bid closely aligning with the original cost estimates.[1] Consequently, the contract was successfully awarded to the company, which then commenced construction of the metro station in accordance with the agreements.
The Yellow Line began operations from 10 August 2025 and has been officially inaugurated by Prime Minister Narendra Modi, with four trainsets which are ready for operations after arriving from Titagarh Rail Systems in Kolkata.[2][3][4][5][6][7][8] The opening was delayed from May 2025 as previously announced by the Namma Metro Managing Director, Maheshwar Rao.[9][10][11]
Remove ads
Station layout
Singasandra track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left ![]() | |
Platform 2 Southbound |
Towards → Delta Electronics Bommasandra Next Station: Hosa Road | |
Platform 1 Northbound |
Towards ← Rashtreeya Vidyalaya Road Next Station: Kudlu Gate | |
Side platform | Doors will open on the left ![]() | ||
L2 | ||
Remove ads
Entry/Exits
There are three entry/exit points – A, B and C. Commuters can use either of the points for their travel.
![]() | This section is empty. You can help by adding to it. (August 2025) |
Gallery
Here are some of the metro station captures shown below:-
- This metro station on U/C as of September 2023
- This metro station on U/C as of December 2023
- Installation of the station name board as on April 2024
Remove ads
See also
References
External links
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads