Top Qs
Timeline
Chat
Perspective
Brickland MRT station
Future Mass Rapid Transit station in Singapore From Wikipedia, the free encyclopedia
Remove ads
Brickland MRT station is a future Mass Rapid Transit (MRT) station on the North–South line located in Singapore. It will serve the Choa Chu Kang Neighbourhood 8 as well as Pavilion Park and Tengah Brickland District.[1]
Remove ads
History

Brickland station was first announced on 25 May 2019 as part of the Land Transport Authority's (LTA) Land Transport Master Plan 2040.[2] The station was planned to serve approximately 13,000 existing households from Keat Hong, Bukit Batok West, Pavilion Park, Tengah town’s Brickland district, and future residential developments.[3] Officially confirmed on 28 July 2023, the station is targeted to begin construction in 2024 with a completion date of 2034. Construction works for the station will include a new viaduct and crossover tracks.[4][5] The longer construction duration for the infill is due to extensive modification works needed which requires realignment of the road and railway tracks. This would require additional 54-hour closures in 2028–2029. Construction can only take place during maintenance hours at night.[6]
Remove ads
Details

Serving the North South line (NSL), Brickland station will be between the Bukit Gombak and Choa Chu Kang stations. The official station code will be NS3A.[7] The station will be constructed along Bukit Batok West Avenue 5 near the junction with Bukit Batok Road.[8]
References
Wikiwand - on
Seamless Wikipedia browsing. On steroids.
Remove ads